My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
blank- LT-SS-2020-001-Cle Elum- Horse Park
>
Meetings
>
2020
>
09. September
>
2020-09-15 10:00 AM - Commissioners' Agenda
>
blank- LT-SS-2020-001-Cle Elum- Horse Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 12:15:04 PM
Creation date
9/10/2020 12:14:04 PM
Metadata
Fields
Template:
Meeting
Date
9/15/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
b
Item
Request to Approve the Lodging Tax Advisory Committee Small Scale Grant Contracts LT-SS-2020-001 through LT-SS-2020-005
Order
2
Placement
Consent Agenda
Row ID
66566
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tourism-Related, Small-Scale Municipality-Owned Capital Project Narrative <br />1. Project Description: Please describe the project in detail. lndicate the major work to <br />be completed, any milestones that need to be overcome in order for the project to <br />moveforward, and include a comparison of existing and proposed conditions. <br />The City of Cle Elum is applying for 550,000 toward completing Phase 1 construction of a <br />covered arena at the Washington State Horse Park. Phase 1 includes design, engineering, <br />permitting, site preparation, utilities and construction of a 200'x 360' steel building covering a <br />150'x 300' fenced riding arena. Completion of Phase L will allow the Park to open the arena for <br />use and begin hosting events and recreational riding. Phase 2 will include portable bleachers, <br />weather screens, restrooms and landscaping. <br />The Park's 54,0m budget for Phase 1 was originally developed in 2016 and some estimates were <br />updated in 2018. lt was based on preliminary engineering and other assumptions, and between <br />2AV-2O18 the Park was bble to fully fund the S+.Om of anticipated costs through a combination <br />of state and county grants and private donations {see exhibit 1). <br />ln spring 2019 the Park began permitting, clearing, grading and soliciting competitive bids for <br />various aspects of construction. As the project progressed and bids came in, many were over <br />the budgeted amounts in part reflecting an overheated construction industry in recent years. <br />The Horse Park Authority board made a number of design decisions to cut costs where feasible <br />For example, they eliminated the "eyebrow" roof at the gabled ends as depicted below in the <br />artist's rending compared to the actual current picture of the arena on the next page,
The URL can be used to link to this page
Your browser does not support the video tag.