My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-22-minutes-public-works-study-session
>
Meetings
>
2020
>
08. August
>
2020-08-04 10:00 AM - Commissioners' Agenda
>
2020-06-22-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2020 1:37:09 PM
Creation date
7/30/2020 1:36:15 PM
Metadata
Fields
Template:
Meeting
Date
8/4/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
65242
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r ��"�.�w / , <br />AGRL'EMEi1T 6 <br />gym`✓LG 52 <br />t <br />Tl is AG;„_._I,.. ;i, made and ent,ared into this eC�Jl=i__ day o` U Pr_ <br />19'�a <br />, by d between the State of Va'sh'_ngton, 'Washington State laghww Commission, <br />acting by and through the Director of Hin,hvmys, hereinafter called the "State", and <br />the Board of Commissioners of Kitt:it2s County, hereinafter referred to as the "County". <br />VaMREAS, the State plans, the construction of a fully access controlled <br />four lane highway, SR 90 from Milepost 67.41 to 72.22 in the vicinity of Easton <br />to replace existing SR 90, and <br />VI!ERL-AS, such construction is necessary to provide a highway facility con- <br />sistent with standards established for the functional classification assigned by the <br />Vashi.ngton State Highway Commission to SR 90 in this area, and <br />the above -noted construction requires the rearrangement of certain <br />existinu uuu",y i..& un d the, conctr"Vion of access and frontage roads to <br />preserve access to adjacent properties, <br />NOW T,IEREFORE, in accordance with a policy entitled "Design Standards for <br />Rearranged County Roads, Frontage Roads, Access Roads, Interoections, Romps and <br />Crossings", approved May 20, 1966, by the Vashi.ngton State Association of County <br />Commissioners and approved August 15, 1966, by the Vashington State Highway Coamissi.on, <br />by Resolution No. 1773 or amendments thereto, which by this reference is made a part <br />hcrcof for all intents and purposes as if fully set forth herein, <br />IT IS MUTUALLY AG2ErD THGT: <br />t <br />The State will construct such county road connections and frontage roads <br />as are shown marked in red and green on attached Exhibit "A", which is hereby made <br />a part of this agreement. The State will further construct such roachiays in conformance <br />with Washington State Standard Specifications for Road and 5riiige Construction, and in <br />PROPERTY MANAGEMENT <br />Inventory Control Number <br />
The URL can be used to link to this page
Your browser does not support the video tag.