My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-09-minutes-solid-waste-and-maintenance
>
Meetings
>
2020
>
07. July
>
2020-07-07 10:00 AM - Commissioners' Agenda
>
2020-06-09-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2020 3:03:02 PM
Creation date
7/2/2020 3:01:43 PM
Metadata
Fields
Template:
Meeting
Date
7/7/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
64177
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Supplement to JARPA -Kittitas Waste Transfer Station <br />Ellensburg, Kittitas County, WA <br />the needs of the Kittitas County. The new facility will be designed to meet the needs of the <br />growing population in Kittitas County. <br />Minor Collector Road. The minor collector road will be located along the southern site boundary. <br />A 64 -foot right-of-way was established on the centerline of the southern boundary to <br />accommodate this road. The purpose of the minor collector road is to achieve the connectivity <br />goals of the Ellensburg Comprehensive Plan. Kittitas County will construct the half -street <br />improvements and full roadway improvements needed to accommodate vehicle and truck <br />traffic. The paved portion will measure 22 feet with an additional 13 feet of curb/gutter, <br />sidewalks (separated from the curb), street lighting, permanent signage, storm drainages, and <br />other items associated with minimum public improvements consistent with Public Works <br />Development Standards. <br />US -97 Improvements. US -97 will be upgraded with half street improvements along the eastern <br />frontage and widened to the standards of a principle arterial. The current footprint of US -97 is <br />38 feet. The designated ROW would eventually be 104 -feet. The paved roadway will be widened <br />35 feet to add a second travel lane, turn lane, and bike lane. Street improvements will include <br />concrete curb/gutter, sidewalks (separated from the curb), street lighting, permanent signage, <br />asphalt, asphalt markings, gravel base, storm drainage, and other items associated with <br />minimum public improvements consistent with Public Works Development Standards. Utilities <br />will be buried beneath the street improvements, adjacent to the US -97 roadway. While the <br />utilities and roadway widening will happen during construction of the minor collector, the <br />remaining street improvements would be deferred until the Maintenance Facility is designed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.