Laserfiche WebLink
Estimated Engineering Fee — Phase 6, Phase 1 Design Services <br />Task <br />Labor <br />Labor Cost <br />Subconsultants <br />Expenses <br />Total <br />Hrs. <br />Task 1— Project Management <br />66 <br />$19,510 <br />$1,000 <br />$20,510 <br />Task 2 — Field Work <br />106 <br />$16,240 <br />$24,750 <br />$40,990 <br />Task 3 — Permitting <br />236 <br />$39,740 <br />$39,740 <br />Task 4 — 60% Design Drawings and <br />388 <br />$58,740 <br />$58,740 <br />Specifications <br />Task 4 — 90% Design Drawings and <br />328 <br />$49,940 <br />$49,940 <br />Specifications <br />Task 4 —100% Design Drawings and <br />216 <br />$32,860 <br />$32,860 <br />Specifications <br />Task 5 — Unplanned/Unanticipated Critical <br />100 <br />$18,320 <br />$18,320 <br />Tasks <br />Total <br />1,440 <br />$235,350 <br />$24,750 <br />$1,000 <br />$261,100 <br />