Laserfiche WebLink
BID TABS <br />2020 ANNUAL PAI NT STRIPE PROJECT <br />E\oI EERS ESTIMATE SpeNIIteE Pm mentolrMn&Inc sweskGf <br />Item'It Quantity <br />Unit <br />SCHEDULE. (COUNTY ROADS) <br />Pavement Ma rkings <br />Pavament Markings <br />Unit Cosi I <br />Total Cost <br />Unit Cost <br />I Total Last <br />Unit Cost <br />Total Cost. <br />1 <br />210.14 <br />MI <br />4"YELLOW(SKWCENTERLINFSTBIDE <br />$ <br />1136.501 <br />$ 28,684.11 <br />$ 155W <br />$ 32,671,70 <br />$ 135.00 <br />$ 28,368.90 <br />2 <br />309.95 <br />MI <br />d"VF.ILOW (SOLID)"NO PASSING 20NF." <br />$ <br />31500 <br />$ 9],602.]5 <br />$$ 506.00 <br />$$ 139,432.50 <br />$ 310,00 <br />5 96,053.50 <br />3 <br />2.19 <br />MI <br />4"WHITE (SKTP)CENTERLINE <br />$ <br />346.50 <br />$ 758.84 <br />$ 650.00 <br />$ 1,423.50 <br />$ 335.00 <br />$ 733.6S <br />4 <br />2]6,59 <br />MI <br />T' WHITE{SOLID] EDGE &TURN LANES <br />$ <br />396.50 <br />$ 95,638_44 <br />. $ ._ ._.385.00 <br />$ 106,48].15 <br />$ 33100 <br />S 92,65].65 <br />SCHEDULE B (CITY OF ELLENSBURG) <br />Item #I <br />Oua ntityUnit <br />Pavament Markings <br />Unit Cost <br />Total Cost <br />Unit Cost <br />Total Cost <br />Unit Cost_ <br />__T_otal Cost__ <br />5 <br />4A2 <br />MI <br />4"YELLOW ISKIP)CENTERLINE STRIPE <br />$ <br />399.00 <br />5 1,76.3.58 $ <br />65D:W <br />$ 2,8?3.00 <br />$ 400.00 <br />$ 1,768.00 <br />6 <br />48.85 <br />MI <br />4" YELLOW (50110) "NO PASSNG 20NE" <br />$ <br />430.50. <br />$ 21,019.93 $ <br />550.00 <br />$ 26,86].50 <br />$ 41500. <br />$ 20,2]2.75 <br />7 <br />18.19 <br />MI <br />4"WHITE 150110) EDGE & TURNIANES <br />$ <br />430'.50 <br />$ ],830.80 $ <br />650.00 <br />$ 11,823.50 <br />_- <br />S 415.00 <br />$ 7,548.85 <br />8 <br />0.13 I <br />MI <br />4"WHITESKIP <br />IS <br />399.00.$ <br />51.87 1 <br />650.015 <br />84.50 <br />1 $ 400:00.1 <br />$ 52.00 <br />IF <br />I- SCHEDULE E(BOWERS FIELD) I Unit Cost I Total Cost I Unit Cost I Total Cost I <br />TOTAL PROJECT 810: $ 259,269.15 $ 333,265,75 $ 253A96.>0 <br />s,nlila.d Pavement Matting lnc 5MOeRlle <br />Estimated Range: $ 246,305.69 $ 272,232.51 <br />Bq�ava peon re!!:C fora¢ulxy, anbyanally ul bb i:ev.TWaureMns have bean Ulel.'kel mld mMilrtxd. <br />i .. G <br />Z', <br />