My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-08-minutes-public-works-study-session
>
Meetings
>
2019
>
04. April
>
2019-04-16 10:00 AM - Commissioners' Agenda
>
2019-04-08-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:15:38 PM
Creation date
5/12/2020 2:13:29 PM
Metadata
Fields
Template:
Meeting
Date
4/16/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
52889
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />PUBLIC WORKS — BOARD OF COUNTY CONI USSIONERS <br />STUDY SESSION STAFF REPORT <br />STUDY SESSION DATE: April 8, 2019 <br />TOPIC: City of Cie Elam Certified Agency Request <br />ACTION REQUESTED: Support the Hiring of Two Temporary Operators <br />LEAD STAFF: <br />Mark R. Cook <br />RECON ENDATION: <br />Support the hiring of two temporary equipment operators in Public Works. <br />BRIEFING SUMMARY: <br />• Recent promotion of an Equipment Operator to Public Works (PW) Engineering <br />Technician 1 creates a hiring need <br />• PW is a certified agency (CA) by Washington State Department of Transportation <br />(WSDOT) <br />• The City of Cie Elum is requesting PW serve as CA supporting pending Phase II <br />improvement to First Street <br />• HLA (Yakima) is contracted to provide administrative and full-time inspection <br />services supporting the project <br />BACKGROUND: <br />Certified Agency status allows PW to administer federal aid construction projects. Using <br />PW as a CA, the City of Cle Elum is able to comply with WSDOT Local Agency <br />Guidelines in meeting FHWA requirements. The recent hiring of an existing equipment <br />operator to Engineering Technician 1 creates a vacancy in the maintenance division. PW <br />provided similar project support to the City of Kittitas in 2016. <br />DISCUSSION: <br />PW's 2019 construction schedule is tasting our ability staffing With qualified construction <br />inspectors. PW currently has two seasoned inspectors (Case and Walters). 2018 <br />construction will likely complete May of 2019 (Maruwash and No. 6). Big Boulder, <br />Fairview and Story Creep are all slated to construct summer and fall of 2019. PW does <br />not have the inspection resource for CA oversight — at this time. Learning from our <br />Kittitas CA experience, PW desires having an inspector available to assist HLA ensuring <br />federal aid compliance. <br />Page 1 of 3 <br />PLTBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFP REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.