My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-11-minutes-public-works-study-session
>
Meetings
>
2019
>
04. April
>
2019-04-02 10:00 AM - Commissioners' Agenda
>
2019-03-11-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:13:22 PM
Creation date
5/12/2020 2:12:58 PM
Metadata
Fields
Template:
Meeting
Date
4/2/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
52591
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS <br />STUDY SESSION STAFF REPORT <br />STUDY SESSION DATE: <br />TOPIC: <br />ACTION REQUESTED: <br />LEAD STAFF: <br />Mark R. Cook <br />March 11, 2019 <br />Upper County Shop Construction Project <br />Position <br />Authorize Public Works to Finalize a Project <br />Position with Human Resources <br />RECOMMENDATION: <br />Authorize Public Works (PW) to finalize a project position supporting construction <br />management during Upper County Shop construction. <br />BRIEFING SUMMARY: <br />a Attempts to secure construction management services from KPG have failed <br />a Public Works (PW) has secured interest in a project position from a previous <br />County employee with significant building construction experience <br />a $60 per hour is anticipated for compensation (KPG is suggesting $100/hour if <br />they provide service) <br />BACKGROUND: <br />Upper County Shop (UCS) construction is nearing. We anticipate requesting advertising <br />on March 19, 2019 with a bid opening on April I Oa'. Bid award is anticipated on April <br />16a'. Construction could begin mid-May 2019. <br />DISCUSSION: <br />PW does not have qualified vertical construction inspection experience that can support <br />the UCS build schedule. For the past several months, PW has been investigating the <br />possibility of contracting service through KPG or Jacobs. Resources do not appear to be <br />readily available. <br />It appears that a retired County building official is interested in supporting our UCS <br />project. The project employee would provide inspector daily reports and coordinate <br />contractor and material testing needs with PW. The employee would set their own work <br />schedule working part time as appropriate. <br />Pagel of 2 <br />PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.