Laserfiche WebLink
FU. LCRU. M <br />environmental consulting <br />Environmental Protection Agency (EPA) Method 6010 to determine lead concentration in the painted material. <br />Laboratory analysis confirming low or non -detect lead concentration is required for worker protection <br />regulatory compliance. <br />Fulcrum estimates that approximately 30 to 60 XRF readings of suspect lead containing paint or coatings, such <br />as ceramics, may be necessary to adequately determine lead presence in building materials from the building. <br />In addition, Fulcrum will collect 10 to 15 paint chip samples for laboratory analysis. Results will be summarized <br />in the hazardous building materials inspection report. <br />Lighting and Electrical Components <br />Fulcrum's inspectors will examine representative fluorescent light fixtures, transformers, and other electrical <br />equipment to determine likely presence of PCB, mercury or other potentially hazardous materials. Following <br />the inspection, Fulcrum will summarize quantity and locations of materials identified. Results will be <br />summarized in the HBM inspection report. <br />Refrigerant Containing Systems <br />Identification of building systems with ozone depleting compounds, refrigerants, or other fluid systems will <br />be accomplished through visual inspection. As part of Fulcrum's services we do not disassemble equipment. <br />Rather, through inspection, assessment, and experience; Fulcrum's staff identifies presence, type, and <br />number of ozone depleting compound containing building systems. This information is used to prepare the <br />relevant investigation report sections and is used as the basis for project specification development. <br />Schedule <br />Fulcrum will complete the site inspection within five days of notice to proceed. Fulcrum has proposed to <br />complete all analysis on a laboratory turnaround time of five business days. Fulcrum will prepare the <br />inspection report for delivery to you within 15 business days of laboratory analytical receipt. <br />Fee Estimate <br />Fulcrum proposes to provide environmental services to complete the HBM inspection services on a time <br />and materials basis. See Fulcrum's 2016 Standard Rate Schedule attached to this proposal. Our fee <br />projection includes inspection time, reporting, analytical fees, and reimbursable expenses. <br />Mr <br />�o <br />P. 509.574.0839 F. 509.575.8453 <br />Hazardous Building Materials Inspection Proposal 3 406 North 2nd Street <br />830 North Poplar, Ellensburg, Washington Yakima, Washington 98901 <br />efulcrum. net <br />