My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-28-minutes-public-works-study-session
>
Meetings
>
2018
>
11. November
>
2018-11-06 10:00 AM - Commissioners' Agenda
>
2017-08-28-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:08:17 PM
Creation date
5/12/2020 2:07:10 PM
Metadata
Fields
Template:
Meeting
Date
11/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
49048
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
square foot. Rates for a new lease are at a rate of twelve (12) <br />cents per square foot. Mark Cook commented that he proposed to <br />the DNR that a structured rate increase be set over each biennium. <br />Discussion was held. No direction was given. <br />WIEHL ROAD IMPROVEMENT DISTRICT UPDATE <br />Mark Cook gave background on the project and stated that staff has <br />been working with residents for the past two (2) years on a solution <br />to the roadway improvements. Mark Cook continued that a path to a <br />solution was to form a Road Improvement District with the property <br />owners and have the roadway built to current standards. Mark Cook <br />added that after legal review there are a few items that need to be <br />researched before moving forward. Mark Cook stated that the re -design <br />and cost estimating are complete and the project costs are around <br />$750,000, which is an increase from previous cost estimating. <br />Discussion was held. Two (2) members of the public commented on the <br />topic. The Board committed to contributing $150,000 and overage costs <br />for the project. <br />OTHER BUSINESS: <br />EXIT 78 CLOSURE TIMES SET BY WASHINGTON STATE DEPARTMENT OF <br />TRANSPORTATION (WSDOT) <br />Mark Cook stated that staff and Board members attended a meeting with <br />WSDOT regarding the ongoing traffic issues affecting Nelson Siding <br />Road. Mark Cook continued that at the conclusion of the meeting <br />direction was given to him to notice WSDOT of preferred closing time <br />for September 4 at Exit 78 westbound was to be from loam to midnight. <br />Mark Cook added that after speaking with WSDOT they suggest closure <br />from Sam - Spm. Discussion was held. Staff was directed to contact <br />WSDOT to confirm the closure times as 8am - 8pm for September 4 <br />Westbound closure at Exit 78. <br />2017-08-28 MINUTES <br />KITTITAS COUNTY COMMISSIONERS <br />KITTITAS COUNTY, WASHINGTON <br />Laura Osiadacz, Chairman <br />
The URL can be used to link to this page
Your browser does not support the video tag.