My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-22-minutes-public-works-study-session
>
Meetings
>
2018
>
11. November
>
2018-11-06 10:00 AM - Commissioners' Agenda
>
2017-05-22-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:10:01 PM
Creation date
5/12/2020 2:06:51 PM
Metadata
Fields
Template:
Meeting
Date
11/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
49048
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Priority #I: Roadside Hazard Safety Imoravements <br />ESTIMATED COST $690,x,, <br />Guardrail, signs and delineation -$585,150 <br />• Thorp Cemetery Rd has three sections of inadequate railing that requires replacement and <br />curves that need del€neators and/or signs from MP 0.00 to MP 3.02 <br />• Thorp Pralne has two segments selected in the safety plan. One segment has curves that need <br />guardrail, signs and delineators between MP 0.00 to MP Z.O. The other segment has a curve <br />with a steep embankment that may require guardrail along with signs and dellneators between <br />M P 5.77 and MP 7.64 <br />• Lower Peoh Point Rd has steep embankments and two curves In need of guardrail and signs <br />between MP 2.90 and MP 5.03 <br />Salmon La Sac Rd has guardrail, signs and dellneators but a portion of the road is reflecting <br />accident data that Identify the <br />need for additional guardrail, <br />signs and/or delineators between <br />MP 9.0 and MP 10.59 <br />• Westside Rd has a segment <br />between MP 2.14 and MP 3.94 - <br />just outside the current projectthat also has curves and steep <br />embankments that would benefit <br />t <br />• .�.-_.tib:.�,,� <br />�. y�sAne+.ti.TAM <br />uwrrr, <br />ewe.. <br />9 <br />.. <br />JIIA <br />dw <br />Guardrail, signs and delineation -$585,150 <br />• Thorp Cemetery Rd has three sections of inadequate railing that requires replacement and <br />curves that need del€neators and/or signs from MP 0.00 to MP 3.02 <br />• Thorp Pralne has two segments selected in the safety plan. One segment has curves that need <br />guardrail, signs and delineators between MP 0.00 to MP Z.O. The other segment has a curve <br />with a steep embankment that may require guardrail along with signs and dellneators between <br />M P 5.77 and MP 7.64 <br />• Lower Peoh Point Rd has steep embankments and two curves In need of guardrail and signs <br />between MP 2.90 and MP 5.03 <br />Salmon La Sac Rd has guardrail, signs and dellneators but a portion of the road is reflecting <br />accident data that Identify the <br />need for additional guardrail, <br />signs and/or delineators between <br />MP 9.0 and MP 10.59 <br />• Westside Rd has a segment <br />between MP 2.14 and MP 3.94 - <br />just outside the current projectthat also has curves and steep <br />embankments that would benefit <br />
The URL can be used to link to this page
Your browser does not support the video tag.