My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-24-minutes-public-works-study-session
>
Meetings
>
2018
>
10. October
>
2018-10-16 10:00 AM - Commissioners' Agenda
>
2018-09-24-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:06:58 PM
Creation date
5/12/2020 2:06:00 PM
Metadata
Fields
Template:
Meeting
Date
10/16/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
48517
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Court House during the period of time from resolution adoption to the date of the <br />public hearing. <br />3. Public Works prepares notices of the hearing and mails same to all benefitted <br />property owners in the district boundary at least 15 days prior to the date set for <br />the public hearing. <br />4. The public hearing is conducted to determine the fate of the proposed RID.\ <br />5. The formulation of the RID may be divested within thirty days upon receipt of <br />protest from property owners within the district comprising sixty percent of more <br />of the total costs of the improvements. <br />6. The Board MAY provide as a part of the Ordinance consideration of undeveloped <br />properties terms of reimbursement and may include terms allowing a one time, <br />lump sum payment or that reimbursement shall be made over a period not to <br />exceed five years. Additional conditions are provided at RCW 35.43.188 <br />(EXHIBIT 1 attached). <br />PW suggests advertising the project with a ten percent contingency (our typical <br />maximum variation from the Engineer's estimate for awarding construction). <br />FISCAL IMPACTS: <br />Current project cost estimate is $874,270. <br />$600,614 from benefit contribution (residents). <br />Board contribution in the amount of $273,656. <br />ATTACHMENTS: <br />Exhibit 1: <br />Revised Code of Washington 35.43.188 <br />Exhibit 2: <br />RID 2018-01 Boundary Map <br />Exhibit 3: <br />RID Property owner list <br />Exhibit 4: <br />RID Formulation schedule <br />Exhibit 5: Revised Code of Washington 35.43 (complete section) <br />Page 2 of 7 <br />PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.