Laserfiche WebLink
IQTTITAS COUNTY <br />3kKX=XTA9& CD <br />DEPARTMENT OF PUBLIC WORKS <br />Formal Task Order Document <br />Jacobs Engineering Group <br />Agreement KCPW2017-19ENG1 <br />Task Order Number 1.03 <br />Maximum Amount Payable $301,103 Completion Date <br />12/31/18 <br />The general provisions and clauses of Local Agency Agreement Number KCPW2017- <br />19ENG1 shall be in full force and effect for this Task Order. <br />Location of Project: Manastash Road, MP 10.8 <br />Project Title: Manastash Creek Bridge Replacement <br />Description of Work: This change order is to add drilled shaft inspection/observation services <br />during construction that will be provided by Aspect Consulting. These services will be added <br />into Task 14, Construction Services. The latest contractor schedule shows a start date of <br />September 10, 2018 for the drilled shaft construction and assumes a 10 day duration. <br />Tasks 2 through 13 — No change in scope; all deliverables completed in prior phase. <br />Task 14 — Construction Services: This task includes Aspect Consulting providing geotechnical <br />staff on-site during the construction of the drilled shafts to document/confirm soil conditions <br />outlined in the Geotechnical report. See attached Scope of Work. <br />Assumptions & Exceptions: See attached Scope of Work. <br />Deliverables: See attached Scope of Work. <br />Cost Breakdown: $21,500 for labor and direct expenses. <br />Project Schedule: <br />Completion of <br />Agency Signature: <br />Consultant Signature: <br />Date: 1C) <br />Date: 9 1 o� DC7 <br />