My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-27-minutes-public-works-study-session
>
Meetings
>
2018
>
09. September
>
2018-09-18 10:00 AM - Commissioners' Agenda
>
2018-08-27-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:06:00 PM
Creation date
5/12/2020 2:05:11 PM
Metadata
Fields
Template:
Meeting
Date
9/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
47908
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IO 1.1/., <br />��`��, KZT'rZTg45t COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />AITI'I'C4l COl'NTl' <br />• Minor roadway widening to improve safety. <br />Task 01 — Project Management <br />1. Project planning, team direction and coordination and ongoing client communication <br />a. Develop Project Execution Plan/Project Procedures Manual; <br />b. Provide team direction and oversight; <br />c. Provide updates and reports to the Owner (e.g., weekly, monthly, etc.); <br />d. Develop and implement Hazard Assessment Safety Action Plan (HASAP); <br />e. Plan and facilitate internal team project meetings; <br />f. Plan and facilitate external project meetings with the County and stakeholders: include <br />location and anticipated attendees from both the Jacobs team and Owner team; prepare <br />meeting materials; conduct meeting(s); develop meeting minute(s); distribute minute(s); <br />and incorporate edits from comments. <br />g. Review each submittal and/or deliverable check and verify deliverables compliance with <br />scope, schedule, budget and quality. <br />2. Project Controls <br />a. Monitor expended and remaining budget, and forecast cost to complete; <br />b. Prepare monthly invoices and back-up, and monthly progress reports. <br />c. Sub consultant management to include subcontract execution, review and incorporation of <br />sub consultant invoices and progress reports and monitoring of sub consultant financial <br />status. <br />d. Monitoring and updating project design schedule. <br />3. Quality <br />a. Develop and administer Quality Assurance Plan <br />4. Deliverables <br />a. Project Management Plan (including quality plan and safety plan) <br />b. Formal meeting notes (up to 5 meetings) <br />c. Monthly progress reports and invoices <br />Task 02 — Agency Coordination <br />1. Agency Coordination <br />a. Coordinate with Kittitas County Public Works, Kittitas County Community and <br />Development Services, Department of Fish and Wildlife, Department of Ecology, US <br />Army Corps of Engineers, and other agencies as needed. <br />b. Coordination items include stream, hydraulic and structure design, impact analysis, <br />permits required and timelines, and facilitated review of project milestones as needed. <br />Task 03 — Geotechnical Investigations and Reporting <br />Based on a cursory review of available geologic data, the culvert replacements are located in alluvium <br />deposits over likely cemented gravel. The project will be mostly affected by the geotechnical <br />characteristics of the alluvium and depth to bedrock. Key geotechnical considerations will include <br />excavation and dewatering to construct the new structure, and foundations to support it. <br />1. Field Investigation and Laboratory Analysis <br />
The URL can be used to link to this page
Your browser does not support the video tag.