Laserfiche WebLink
Agency Project Title Date <br />Kittitas County Public Works University Wav and Reecer Creek Rd - Inter 8/8/18 <br />Vj No Right of Way Needed ❑ Right of Way Needed <br />All construction required by the E] No Relocation ❑ Relocation Required <br />contract can be accomplished <br />within the exiting riaht of way. <br />Utilities ':. Railroad <br />❑ No utility work required,' No railroad work required <br />✓ All utility work will be completed prior to the start { ❑ All railroad work will be completed prior to the start of <br />of the construction contract the construction contract <br />❑ All utility work will be completed incoordination ❑ All the railroad work will be completed incoordination <br />with the construction contract with the construction contract <br />Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project <br />Utility conflicts will be identified during the PE phase of the project, and utility relocation will be coordinated <br />before construction begins. <br />FAA Involvement <br />Is any airport located within 3.2 kilometers (2 miles) of the <br />Remarks <br />Yes ✓ No <br />Bowers Field airport aeronautical area is located slightly over 2 miles from the project location. Industrial <br />land area within the airport property falls within the 2 mile radius from the project site, but there is no <br />aeronautical activity within this area. <br />--- --... — ...-. --- __ <br />Thi -s protect has-been reviewed by the legislative body of the administration agency or ageneses, or it's_ <br />designee, and is not inconsistent with the agency's comprehensive plan for community development. <br />Agency Kittitas County Public Works <br />Date By <br />Mayor/Chairperson <br />DOT Paan 140-101 Page 3 <br />Revised 0412015 Previous Editions Obsolete <br />