Laserfiche WebLink
Agency Project Title <br />Date <br />Kittitas County Public Works University <br />Way and Reecer Creek Rd <br />- Inter 8/8/18 <br />LType of Proposed Work <br />Project Type (Check all that ApPY) <br />Roadway Width <br />INumber ofLanes <br />❑ New Construction ❑ Path / Trail <br />❑ 3-R 40 <br />2 <br />t✓i Reconstruction ❑ Pedestrian / Facilities <br />❑ 2-R <br />❑ Railroad ❑ Parking <br />✓i Other <br />I <br />❑ Bridge <br />Geometric Design Data <br />Description <br />Through Route <br />Crossroad <br />_ <br />-✓ <br />- <br />Principal Arterial <br />p <br />— ---- <br />El Principal Arterial <br />Federal❑Minor <br />✓� Urban <br />Arterial <br />✓ Urban <br />El Minor Arterial <br />Functional ❑Rural <br />❑ Collector <br />El Rural <br />❑ Collector <br />Classification ❑NHS <br />❑ Major Collector ❑NHS <br />[�Major Collector <br />El minor Collector <br />❑ Minor Collector <br />❑Local Access <br />❑ Local Access <br />Terrain Z, Flat ❑ Roll [:]Mountain Z Flat ❑ Roll ❑ Mountain <br />1 <br />Posted Speed 40 <br />__. <br />35 <br />Design Speed j40 <br />�35 <br />_ <br />Existing ADT 8,771 <br />_ <br />4,419 <br />Design YearADT 13,033 <br />6;566 <br />Design Year 12,038 <br />2,038 <br />- - <br />Design Hourly Volume (DHV) 1,479 <br />-- — — <br />211 <br />Performance of Work <br />Preliminary Engineering Will Be Performed By <br />Others Agency <br />City of Ellensburg (through Interlocal Agreement) / Consultant <br />- - - - - <br />100 0/o 0 0/J <br />Construction Will Be Performed By <br />t -: <br />Contract Agency <br />Contractor <br />._ - _ ---- <br />100 %'' 0 <br />Environmental Classification <br />❑ Class I - Environmental Impact Statement (EIS) <br />✓. Class II - Categorically Excluded (CE) <br />❑ Project Involves NEPA/SEPA Section 404 <br />✓ Projects Requiring Documentation <br />Interagency Agreement <br />(Documented CE) <br />❑ Class 111 - Environmental Assessment (EA) <br />❑ Project Involves NEPA/SEPA Section 404 <br />Interagency Agreements <br />- Environmental Considerations <br />Environmental permitting needs will be identified during the PE, phase, and any required permits will be acquired during that phase. <br />It is anticipated that NEPA will be the only permit required. <br />I <br />Page 2 <br />DCT Form 140-101 ._ ............. _-- .-....._--..-... <br />Revised 04/2015 Previous Editions Obsolete <br />