My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-10-minutes-solid-waste
>
Meetings
>
2018
>
08. August
>
2018-08-07 10:00 AM - Commissioners' Agenda
>
2018-07-10-minutes-solid-waste
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:02:14 PM
Creation date
5/12/2020 2:01:32 PM
Metadata
Fields
Template:
Meeting
Date
8/7/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
47023
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Central Paving, LLC ENTRAL <br />509-929-1044 <br />team@centralpavingllc.com <br />www.centralpavingllc.com Cvvwvv.centra1paving11c.com <br />PROPOSAL <br />ADDRESS PROPOSAL # 3177 <br />Patti Johnson DATE 06/13/2018 <br />N.W. & S.W. Corner of 6th EXPIRATION DATE 07/13/2018 <br />and Water, <br />Ellensburg WA 98926 <br />JOB # PREVAILING: ESTIMATOR: <br />181-2324 YES Colby Peone (509) 201-2973 <br />DESCRIPTION AMOUNT <br />Sealcoat + Crack Seal <br />Clean asphalt, remove dirt, weeds and debris from cracks, seal cracks greater than 1/4" wide <br />with premium rubberized hot melt crack sealer (excludes alligator cracked areas), apply one <br />coat of Washington State Department of Transportation (WSDOT) approved Armorseal A-100 <br />HD (Heavy Duty) sealcoat at a rate of 40 square feet per gallon. <br />- 41300 sf sealcoat <br />- 500 If crack <br />Pavement Marking <br />Layout parking area as necessary and install lines and markings with Washington State DOT <br />approved traffic paint as follows: <br />- Includes one coat of paint <br />- Per existing layout <br />Subtotal 6,850.00T <br />- Proposal includes 1 mobilization(s)/shift(s)/day(s) to complete work (1 paving). If additional <br />mobilizations/shifts/days are required, please add $1,000/MOB. <br />- Proposal excludes everything not outlined in this proposal. <br />- Any alteration or deviation from above specifications involving extra costs, will be executed <br />only upon written orders, and will become an extra charge over and above this proposal <br />estimate. <br />- The prices on this proposal are subject to increases at ANY time based on a volatile liquid <br />asphalt cement market. <br />- Unless otherwise noted, proposal excludes subgrade and base prep, surveying, staking, <br />testing, saw cutting, prime coat, soil sterilant, utility adjustments, patching of utilities, traffic <br />control, permits, locates, fees, bond, preliminary spotting, layout, irrigation work, night work, <br />weekend work, use tax, and sales tax. <br />- This proposal sheet and contract must be attached to and become part of any subcontract <br />agreement. <br />- Proposal is good for 30 days from above date or 10 days after execution of bid, whichever is <br />shorter. <br />- Central Paving, LLC is hereby authorized to furnish all materials SUBTOTAL 6,850.00 <br />and labor required to complete the work mentioned above and TAX (8.3%) 568.55 <br />according to the terms thereof. Interest on any unpaid balance TOTAL $7 418.55 <br />over 30 days from billing date will be charged at 1.5% per month. s <br />Central Paving, LLC reserves the right to hold owner <br />- If you have any questions regarding this proposal or contract, please feel free to contact us. <br />
The URL can be used to link to this page
Your browser does not support the video tag.