My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-25-minutes-public-works-study-session
>
Meetings
>
2018
>
07. July
>
2018-07-17 10:00 AM - Commissioners' Agenda
>
2018-06-25-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:04:54 PM
Creation date
5/12/2020 2:00:53 PM
Metadata
Fields
Template:
Meeting
Date
7/17/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
46299
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
require special routing of large trucks or heavy construction equipment to prevent impacts <br />to surrounding roads, residences or businesses, the contractor shall be required to develop <br />and use an approved haul route and may be required to enter into a haul road agreement <br />establishing restoration procedures and work to be performed by the contractor upon <br />completion of the haul operation. <br />When required, the haul route plan must be prepared and submitted to the County <br />Engineer and approved prior to beginning or continuing construction. The haul route plan <br />shall address routing, hours of operation, signing, flagging and daily maintenance. <br />If the contractor's equipment or suppliers fail to use the designated haul route, the County <br />Engineer may prohibit or limit further work on the development until such time as the <br />requirements of the haul route are complied with. <br />The County Engineer may require the contractor to submit a pavement analysis of the <br />proposed haul route, prior to and immediately after construction ends. The pavement <br />analysis shall be performed by an engineer licensed in the State of Washington. if the final <br />pavement analysis determines that the roadway has been damaged, the contractor shall be <br />responsible for restoration of the roadway. <br />7. Haul Route Agreement: <br />When identified as a need by the SEPA review process or by the County Engineer, a haul <br />route agreement shall be obtained by the franchised utility, developer or property owner <br />establishing restoration procedures to be performed upon completion of the haul <br />operation. <br />8. The applicant or their contractor shall provide and maintain all Washington State certified <br />flaggers, flagger protective apparel, barricades, lights, standard signs, cones and other <br />devices, equipment and personnel required to meet Washington Department of Labor and <br />Industries requirements and as necessary for the protection of the public and maintenance <br />of traffic through the limits of the project at the applicant's expense. If the county <br />determines that traffic control is in an unsafe condition, the applicant, contractor, and <br />applicant's engineer, if warranted, shall be notified and shall be required to correct the <br />situation immediately. In circumstances involving an immediate hazard to public safety, the <br />county may make the appropriate corrections at the discretion of the County Engineer or <br />designee. The applicant shall be responsible for all costs incurred by the county. <br />END OF TITLE 12 KITTITAS COUNTY CODE <br />Title 12 Kittitas County Code I Draft No. S — Working Draft forAdoption 6/12/2018 <br />103 <br />