My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-12-minutes-solid-waste
>
Meetings
>
2018
>
07. July
>
2018-07-03 10:00 AM - Commissioners' Agenda
>
2018-06-12-minutes-solid-waste
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:00:46 PM
Creation date
5/12/2020 2:00:26 PM
Metadata
Fields
Template:
Meeting
Date
7/3/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
46040
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Patti Johnson <br />From: Rhonda Gillogly <rgillogly@a-rt.org> <br />Sent: Thursday, April 26, 2018 4:41 AM <br />To: Patti Johnson <br />Subject: Projected costs <br />Patti, <br />I've been doing some brain storming about the courthouse project and have come up with some ideas. Here is <br />what ART will target to provide you for the next review. Let me know if there is something I should add or <br />delete. <br />Option IA: <br />-Review possible square footage that can be added around the existing building up to 2 stories, no basement. <br />- Provide an average cost per square foot for new construction. Include cost increase factors associated with <br />structural precautions and modifications to prevent failure to existing structural components. <br />- Provide cost increase factors working around and in an occupied facility. <br />- Provide cost escalation to build in 2 years and 3 years <br />Option 1B: <br />- same as above but for a 3 story structure <br />Option 2: <br />- Cost to upgrade existing building electrical system <br />- Cost to upgrade existing building HVAC <br />- Cost to upgrade exterior facade to something similar to the Yakima County Courthouse <br />- New Roofing not included for existing building <br />* These items can be used with item 4 below <br />Option 3: <br />- provide square foot cost average to do interior demo and new construction for the existing building. <br />* This number can be used in association with Option 4 below. <br />Option 4: <br />- create 2 to 3 different scenarios using items above to determine how much new construction can be built on <br />the north site for $20M. <br />- Provide average cost per square foot to develop unused site for parking/ park Provide estimate of overall cost <br />based on remaining space available once new building s.f. is estimated. <br />Option 5: <br />I'll get feedback from our cost estimator on savings available to build single story vs. Multi story <br />Notes: Construction costs will be an average based on basic finishes and high end finishes ( Courtroom). <br />
The URL can be used to link to this page
Your browser does not support the video tag.