My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-26-minutes-public-works-study-session
>
Meetings
>
2018
>
04. April
>
2018-04-03 10:00 AM - Commissioners' Agenda
>
2018-03-26-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:01:49 PM
Creation date
5/12/2020 1:57:14 PM
Metadata
Fields
Template:
Meeting
Date
4/3/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
43585
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Annual report for Cities, Towns and Counties <br />Each annual report shall include the following: <br />1. A copy of the Permittee's current Stormwater Management Program Plan <br />(SWMP Plan) as required by S5.A.2. <br />2. Submittal of the annual report form as provided by Ecology pursuant to S9.A, <br />describing the status of implementation of the requirements of this permit <br />during the reporting period. <br />3. Attachments to the annual report form including summaries, descriptions, <br />reports, and other information as required, or as applicable, to meet the <br />conditions of this permit during the reporting period. Refer to Appendix 3 for <br />annual report questions. <br />4. If applicable, notice that the MS4 is relying on another governmental entity to <br />satisfy any of the obligations under this permit. <br />5. Certification and signature pursuant to G19.D, and notification of any changes <br />to authorization pursuant to G19.C. <br />6. Permittees shall include with the annual report, notification of any annexations, <br />incorporations or jurisdictional boundary changes resulting in an increase or <br />decrease in the Permittee's geographic area of permit coverage during the <br />reporting period. <br />E. Annual report for Secondary Permittees <br />.Each annual report shall include the following: <br />1. Submittal of the annual report form as provided by Ecology pursuant to S9.A, <br />describing the status of implementation of the requirements of this permit <br />during the reporting period. <br />2. Attachments to the annual report form including summaries, descriptions, <br />reports, and other information as required, or as applicable, to meet the <br />conditions of this permit during the reporting period. Refer to Appendix 4 for <br />annual report questions. <br />3. Certification and signature pursuant to G19.D, and notification of any changes <br />to authorization pursuant to G19.C. <br />4. If applicable, notice that the MS4 is relying on another governmental entity to <br />satisfy any of the obligations under this permit. <br />5. Secondary Permittees shall include with the annual report notification of any <br />jurisdictional boundary changes resulting in an increase or decrease in the <br />Permittee's geographic area of permit coverage during the reporting period. <br />Eastern Washington Phase II Municipal Stormwater Permit August 1, 2014 <br />Page 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.