My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-26-minutes-public-works-study-session
>
Meetings
>
2018
>
04. April
>
2018-04-03 10:00 AM - Commissioners' Agenda
>
2018-03-26-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:01:49 PM
Creation date
5/12/2020 1:57:14 PM
Metadata
Fields
Template:
Meeting
Date
4/3/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
43585
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reduce the discharge of pollutants to the MEP, and satisfy state <br />AKART requirements. Documentation shall include: <br />(1) How stormwater BMPs were selected; <br />(2) The pollutant removal expected from the selected BMPs; <br />(3) The technical basis which supports the performance <br />claims for the selected BMPs; and <br />(4) How the selected BMPs will comply with applicable state <br />water quality standards and satisfy the state requirement <br />to apply AKART prior to discharge. <br />Permittees who choose to use the BMP selection, design, <br />installation, operation and maintenance standards in the <br />Stormwater Management Manual for Eastern <br />Washington (2004), or another technical stormwater <br />manual approved by Ecology, may cite this reference as <br />the sole documentation that the ordinance or regulatory <br />mechanism is protecting water quality, reducing the <br />discharge of pollutants to the MEP, and satisfying state <br />AKART requirements. <br />iii. The ordinance or other regulatory mechanism shall include <br />provisions for both construction -phase and post -construction access <br />for Permittees to inspect stormwater BMPs on private properties that <br />discharge to the MS4. If deemed necessary for post -construction <br />access, the ordinance or other regulatory mechanism may, in lieu of <br />requiring that continued access be granted to the Permittee's staff or <br />qualified personnel, instead require private property owners to <br />provide annual certification by a qualified third party that adequate <br />maintenance has been performed and the facilities are operating as <br />designed to protect water quality. <br />iv. The ordinance or other regulatory mechanism shall include <br />appropriate, escalating enforcement procedures and actions. <br />V. The Permittee shall implement an enforcement strategy and the <br />enforcement provisions of the ordinance or other regulatory <br />mechanism. <br />b. Permittees shall implement procedures for site plan review which <br />incorporate consideration of potential water quality impacts. <br />i. Prior to construction, Permittees shall review Stormwater Site Plans <br />for, at a minimum, all new development and redevelopment sites that <br />meet the thresholds in S5.B.5.a.i to ensure that the plans include <br />stormwater pollution prevention measures that meet the requirements <br />in S5.B.5.a.ii. <br />Eastern Washington Phase II Municipal Stormwater Permit —August 1, 2014 <br />Page 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.