My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-26-minutes-public-works-study-session
>
Meetings
>
2018
>
04. April
>
2018-04-03 10:00 AM - Commissioners' Agenda
>
2018-03-26-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:01:49 PM
Creation date
5/12/2020 1:57:14 PM
Metadata
Fields
Template:
Meeting
Date
4/3/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
43585
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
requirement in existing ordinances shall develop and <br />implement criteria to determine when it is infeasible for a <br />project to meet this requirement', including but not <br />limited to: <br />Site/Engineering-based conditions such as soils that <br />do not allow for infiltration of the required volume <br />of stormwater runoff; proximity to a known <br />hazardous waste site or landfill; proximity to a <br />drinking water well or spring; proximity to an onsite <br />sewage system or underground storage tank; <br />setbacks from structures; landslide hazard areas or <br />slopes; seasonal high groundwater; incompatibility <br />with the surrounding drainage system from <br />elevation or location; areas prone to erosion. <br />• Incompatibility with uses related to concerns such <br />as public safety, protection from spills, <br />contaminated sites, or frequently flooded areas. <br />• Incompatibility with state or federal laws. <br />• Permittees shall submit to Ecology with the Annual <br />Report due no later than March 31, 2018 a summary <br />of the criteria defining infeasibility, or a citation for <br />the criteria adopted pursuant to a regional LID <br />manual. <br />(3) To meet the requirements of Appendix 1, Core Element <br />#5 (Runoff Treatment) and Core Element #6 (Flow <br />Control), Permittees may choose to apply the definitions <br />and requirements in Chapter 2.2.5 and 2.2.6 of the <br />Stormwater Management Manual for Eastern <br />Washington (2004), or portions thereof, and the methods <br />described in Chapters 4 and 6 of the Stormwater <br />Management Manual for Eastern Washington (2004), or <br />another technical stormwater manual approved by <br />Ecology. <br />(c) The ordinance or other regulatory mechanism shall include <br />requirements to ensure adequate ongoing long-term operation <br />and maintenance of the BMPs approved by the Permittee. <br />(d) Permittees shall document how the requirements of the <br />ordinance or other regulatory mechanism protect water quality, <br />3 Ecology issued a grant in 2012 to work with Permittees to develop an Eastern Washington LID Manual. Permittees <br />may choose to meet this requirement by adopting the criteria developed in that process. <br />Eastern Washington Phase HMunicipal Stormwater Permit —August 1, 2014 <br />Page 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.