My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-26-minutes-public-works-study-session
>
Meetings
>
2018
>
04. April
>
2018-04-03 10:00 AM - Commissioners' Agenda
>
2018-03-26-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:01:49 PM
Creation date
5/12/2020 1:57:14 PM
Metadata
Fields
Template:
Meeting
Date
4/3/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
43585
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iv. A schedule for implementing the additional BMPs including, as <br />appropriate: funding, training, purchasing, construction, monitoring, <br />and other assessment and evaluation components of implementation. <br />b. Ecology will, in writing, acknowledge receipt of the report within a <br />reasonable time and notify the Permittee when it expects to complete its <br />review of the report. Ecology will either approve the additional BMPs and <br />implementation schedule or require the Permittee to modify the report as <br />needed to meet AKART on a site-specific basis. If modifications are <br />required, Ecology will specify a reasonable time frame in which the <br />Permittee shall submit and Ecology will review the revised report. <br />C. The Permittee shall implement the additional BMPs, pursuant to the <br />schedule approved by Ecology, beginning immediately upon receipt of <br />written notification of approval. <br />d. The Permittee shall include with each subsequent annual report the results <br />of any monitoring, assessment or evaluation efforts conducted during the <br />reporting period. If, based on the information provided under this <br />subsection, Ecology determines that modification of the BMPs or <br />implementation schedule is necessary to meet AKART on a site-specific <br />basis, the Permittee shall make such modifications as Ecology directs. In <br />the event there are ongoing violations of water quality standards despite <br />the implementation of the BMP approach of this section, the Permittee <br />may be subject to compliance schedules to eliminate the violation under <br />WAC 173-201A-510(4) and WAC 173-226-180 or other enforcement <br />orders as Ecology deems appropriate during the term of this permit. <br />e. A TMDL or other enforceable water quality cleanup plan that has been <br />approved and is being implemented to address the MS4's contribution to <br />the Water Quality Standards violation supersedes and terminates the <br />S4.F.3 implementation plan. <br />f. Provided the Permittee is implementing the approved adaptive <br />management response under this section, the Permittee remains in <br />compliance with Condition S4, despite any on-going violations of Water <br />Quality Standards identified under S4.A or B above. <br />g. The adaptive management process provided under Section S.4.17 is not <br />intended to create a shield for the Permittee from any liability it may face <br />under 42 U.S.C. 9601 et seq. or RCW 70.105D. <br />G. Ecology may modify or revoke and reissue this General Permit in accordance with <br />G14 General Permit Modification and Revocation if Ecology becomes aware of <br />additional control measures, management practices or other actions beyond what is <br />required in this permit, that are necessary to: <br />1. Reduce the discharge of pollutants to the MEP; <br />2. Comply with the state AKART requirements; or <br />Eastern Washington Phase 11 Municipal Stormwater Permit —August 1, 2014 <br />Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.