My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-26-minutes-public-works-study-session
>
Meetings
>
2018
>
04. April
>
2018-04-03 10:00 AM - Commissioners' Agenda
>
2018-03-26-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:01:49 PM
Creation date
5/12/2020 1:57:14 PM
Metadata
Fields
Template:
Meeting
Date
4/3/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
43585
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii. Any modified dates or deadlines for developing and implementing <br />this permit, as appropriate to the MS4, and for submitting their first <br />annual report; and <br />iii. A deadline for the MS4 to submit a complete Notice of Intent (see <br />Appendix 5) to Ecology. <br />C. Owners and operators of an otherwise regulated small MS4 are not required to obtain <br />coverage under this permit if <br />1. The small MS4 is operated by: <br />a. A federal entity, including any department, agency or instrumentality of <br />the executive, legislative, and judicial branches of the Federal government <br />of the United States; or <br />b. Federally recognized Indian Tribes located within Indian Country, <br />including all trust or restricted lands within the 1873 Survey Area of the <br />Puyallup Tribe of Indians; or <br />C. The Washington State Department of Transportation. <br />Or, <br />2. The portions of the small MS4 located within the census -defined urban area(s) <br />serve a total population of less than 1,000 people and a, b, and c below all <br />apply: <br />a. The small MS4 is not contributing substantially to the pollutant loadings <br />of a physically interconnected MS4 that is regulated by the NPDES <br />stormwater program. <br />b. The discharge of pollutants from the small MS4 has not been identified as <br />a cause of impairment of any water body to which the MS4 discharges. <br />C. In areas where an EPA approved TMDL has been completed, stormwater <br />controls on the MS4 have not been identified as being necessary. <br />In determining the total population served by the small MS4, both resident <br />and commuter populations shall be included. For example: <br />For publicly operated school complexes including universities and <br />colleges, the total population served would include the sum of the <br />average annual student enrollment plus staff. <br />For flood control, diking, and drainage districts the total population <br />served would include residential population and any non-residents <br />regularly employed in the areas served by the small MS4. <br />Eastern Washington Phase II Municipal Stormwater Permit August 1, 2014 <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.