My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-12-minutes-public-works-study-session
>
Meetings
>
2018
>
03. March
>
2018-03-20 10:00 AM - Commissioners' Agenda
>
2018-03-12-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:00:27 PM
Creation date
5/12/2020 1:56:19 PM
Metadata
Fields
Template:
Meeting
Date
3/20/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
43308
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 5, 2016 <br />Unnamed Tributary 5 (partial reach) <br />o Unnamed Tributary $ (partial reach) <br />Whiskey Dick Creek <br />o Yakima River (partial reach) <br />Task 3. ZONE AE -- Detailed Study Yakima River Cie Elim to Easton <br />WSF will review the detailed study completed by STARR forthe Yakima River between Cie Elum and Easton, <br />including review of the hydraulic model Inputs, to determine if proposed Base Flood Vevations (SFEs) and <br />flood hazard boundary limits appear reasonable, If the BFEs and/or flood hazard delineations do not <br />appear accurate, WSE will create a map and short written summary which identifies and describes <br />apparent problems. <br />Task 4. Flood Hazard Map Lower Manastash Creek <br />WSE will review proposed flood hazard delineations for the lower six miles of Manastash Creek. if the flood <br />hazard delineations do not appear accurate, WSE will create a map and short written summary which <br />Identifies and describes the apparent problem. <br />Task S. Technical Memorandum <br />WSE will prepare a brieftechnical memorandum that compiles the figures and descriptions prepared in <br />Tasks 2 to 4. <br />Task 6. On -Lino Meeting with FEMA & STARR <br />WSE will host an on-line meeting with the County, FEMA, DOE and STARR team representatives to discuss <br />the results of the review. Together the team will decide the best approach to refining the delineations (if <br />needed), <br />Task 7, project Administration <br />WSE will conduct general project administration activities including keeping the County's project manager <br />Informed of all significant project related news, preparation of monthly invoices, and contract <br />management. <br />cost <br />See attached spreadsheet. <br />Schedule <br />WSE will complete the Review by April 15, 2016, assuming all necessary files can be obtained From FEMA by <br />February19. The Task Order completion date will extend to December 31, 2017 to allow ample time to <br />coordinate with and respond to FEMA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.