Laserfiche WebLink
BOARD OF COUNTY COMMISSIONERS <br />COUNTY OF KITTITAS <br />STATE OF WASHINGTON <br />RESOLUTION NO. 2018 -034 <br />TO AUTHORIZE THE CHAIRMAN'S SIGNATURE ON FORMAL TASK <br />ORDER DOCUMENT NUMBER 008 SUPPLEMENT #1 WITH KPFF <br />CONSULTING ENGINEERS <br />WHEREAS: Public Works was awarded Rural Arterial Program (RAP) funds from the <br />County Road Administration Board (CRAB) for the replacement of the <br />No. 6 Road Bridge in 2013; and <br />WHEREAS: The bridge replacement project over Town Ditch is expected to have a <br />total cost of $684,900; and <br />WHEREAS: KPFF Consulting Engineers was selected as a civil on call consultant and <br />is under contract with Public Works through agreement number KCPW <br />2017-19ENG2, Task Order Number 008 approved by Resolution 92017- <br />115; and <br />WHEREAS: Kittitas County Public Works and X -PEE Consulting Engineers have <br />identified additional drainage, driveway, and safety design needs resulting <br />in an increased design cost in the amount of $7,850.00; and <br />NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in <br />the best interest of the public, does hereby authorize the Chairman's <br />signature on Task Order Document Number 008 Supplement #1 with <br />KPFF Consulting Engineers approving the additional cost and amending <br />Task Order Number 008 to include an not to exceed amount of <br />$93,350.00, as attached. <br />DATED on this 26th day of February, 2018, at Ellensburg, Washington. <br />t: <br />clerk of the Board- Julie Kjorsvik <br />�"\`Pm�3rk of the Board- Mandy Buchholz <br />'0 _ <br />BOARD OF COUNTY <br />COMMISSIONERS <br />KITTITAS COUNTY, WASHINGTON <br />ABSENT <br />Laura Osiadacz, Chairman - r <br />