My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-26-minutes-public-works-study-session
>
Meetings
>
2018
>
03. March
>
2018-03-06 10:00 AM - Commissioners' Agenda
>
2018-02-26-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:58:31 PM
Creation date
5/12/2020 1:56:04 PM
Metadata
Fields
Template:
Meeting
Date
3/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
42911
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS <br />STUDY SESSION STAFF REPORT <br />STUDY SESSION DATE: February 26, 2018 <br />TOPIC: Grant County PUD Access Request <br />ACTION REQUESTED: Direct Staff Prepare Easement Documents <br />LEAD STAFF: <br />Mark R. Cook <br />RECOMMENDATION: <br />Direct staff prepares the requested easement documents supporting Grant County PUD's <br />request improving their access ability to the Vantage Boat Ramp. <br />BRIEFING SUMMARY: <br />■ The County entered into an interlocal agreement with Grant County PUD <br />(Resolution 2016-105) sharing operations and maintenance responsibilities at the <br />Vantage Boat Ramp. <br />• The toilets at the boat ramp were constructed with grant funds from the state. <br />• Public Works (PW) has not located the grant agreement and cannot advise the <br />Board at this time on the length of time that we must manage the toilets. <br />• The toilets continue costing PW for operation and maintenance without <br />generating any offsetting revenue. <br />• Poor site design makes the doors subject to wind throw. <br />• Grant County PUD (PUD) desires obtaining additional site access from the <br />County. <br />• Currently, overflow parking is occurring on undeveloped land owned by the <br />County. <br />BACKGROUND: <br />PW holds a permit for use of PUD property (EXHIBIT 1) that currently terminates in <br />2030. PW applied for and received an Outdoor Recreation grant for toilet construction at <br />the Vantage Boat Ramp in 1999 ($218,740) attached as EXHIBIT 2. <br />In PW's 2018 recreation budget, $7,500 is being transferred from the General Fund to <br />cover costs associated with toilet operation and maintenance at Vantage Boat Ramp. <br />Over the past several years, the toilets appear to seeing additional use from I-90 motorist. <br />The poor design of the toilet facility results in numerous repairs the past several years due <br />to wind throw damage. PW believes a wind wall immediately west of the toilets will <br />significantly minimize wind damage to doors and closures. <br />Page 1 of 4 <br />PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.