My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-09-minutes-public-works-study-session
>
Meetings
>
2017
>
12. December
>
2017-12-19 10:00 AM - Commissioners' Agenda
>
2017-10-09-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:54:00 PM
Creation date
5/12/2020 1:52:57 PM
Metadata
Fields
Template:
Meeting
Date
12/19/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
41270
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. : -110( <br />BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter <br />of initiating a county road project designated as: <br />CRP NO: 277-17 JOB NO: RC 1579-J2 <br />IT IS HEREBY RESOLVED that Ringer Loop be improved as follows: <br />Upgrade Ringer Loop Road by installing a turnaround at MP 0.55 (Road <br />Log Number 61503) just North of the washed out portion of Ringer Loop <br />on the newly acquired right of way. <br />ARTERIAL ❑ <br />ACCESS <br />This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report <br />and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). <br />IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the Director of <br />Public Works' estimate, is hereby made in the amounts and for the purposes shown: <br />PURPOSE <br />AMOUNT <br />TOTALS <br />PRELMINARY ENGINEERING <br />$ <br />CONSTRUCTION ENGINEERING <br />$ <br />RIGHT-OF-WAY ACQUISITION <br />$ <br />SUB -TOTAL <br />$ <br />COUNTY FORCES CONSTRUCTION <br />$ 35,000.00 <br />CONTRACT CONSTRUCTION <br />$ <br />SUB -TOTAL <br />$ 35,000.00 <br />TOTAL PROJECT COST <br />$ 35,000.00 <br />GRANT OR OTHER FUNDS <br />$ <br />Grant Source: WSDOT <br />TOTAL COUNTY ROAD FUND ALLOCATION <br />$ 35,000.00 <br />Lucas Huck, P.E. <br />County Engineer <br />❑ THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM AS <br />ITEM NO. 06 <br />® THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN <br />ACCORDANCE WITH RCW 36.81.130 <br />IT IS FURTHER RESOLVED THAT: <br />❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. <br />® THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORC€S, INN ACCOfBD_ANCE WITH RCW 36.77.065 AND <br />WAC 136-18.��� <br />v <br />D ?U <br />ADOPTED this 9th day of October 2017. O. Attest. <br />= i 6 <br />BOARD OF COUNTY COMMISSIONERS 5A <br />KITTITAS COUNTY, WASHINGTON <br />ABSENT <br />Chair Vi - <br />
The URL can be used to link to this page
Your browser does not support the video tag.