If the Board desires a reduction in cost, we will need to negotiate a reduction in project <br />scope. Pavement design could be eliminated but for the fact that the geotechnical <br />evaluation is geared toward defining bearing capacity with end deliverable of a pavement <br />section design meeting design aircraft standards. We currently have rehabilitation cost <br />options generated by Century West that are not likely to change significantly. We could <br />eliminate the remaining meetings including the presentation to the Board. <br />FISCAL IMPACTS: <br />The effort is not currently budgeted in the Airport Fund. Reduction of the scope of work <br />cost can be achieved by reducing the proposed scope of work. <br />ATTACHMENTS: <br />Exhibit 1: HLA electronic mail <br />Exhibit 2: HLA Scope of Work and Standard Contract <br />Page 2 of 4 <br />PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT <br />