My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-09-minutes-public-works-study-session
>
Meetings
>
2017
>
12. December
>
2017-12-19 10:00 AM - Commissioners' Agenda
>
2017-10-09-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:54:00 PM
Creation date
5/12/2020 1:52:57 PM
Metadata
Fields
Template:
Meeting
Date
12/19/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
41270
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L` - <br />Deliverables: <br />1. Draft and final Program Document in electronic format (PDF). <br />Assumptions: <br />1. The Program Document will be the basis for master planning and design in future project <br />phases. <br />2. The draft Program Document presentation will not exceed two (2) hours and will beat the <br />County's Public Works office. <br />TASK 4 — MASTER PLAN DEVELOPMENT <br />Objective: Utilize the space requirements identified in the Program Document to develop a <br />Facility Master Plan for the site. <br />1. Prepare two (2) site layout alternatives, including future expansion capabilities. <br />2. Prepare Rough Order of Magnitude (ROM) cost estimates for both site layouts. <br />3. Provide an internal QA/QC review. <br />4. Present the site layout alternatives to the County. <br />5. Incorporate County comments and further develop the preferred or hybrid site layout. <br />6. Present the preferred alternative to the County. <br />7. Develop preferred alternative into the final Facility Master Plan. <br />Deliverables: <br />1. Site layout alternatives in electronic format and board mounted for presentation. <br />2. Preferred site layout alternative in electronic format and board mounted for presentation. <br />3. ROM for each layout in electronic format (PDF). <br />4. Final Facility Master Plan. <br />Assumptions: <br />1. The County will provide required geotechnical information. <br />2. The County will provide stormwater management strategy information sufficient to <br />develop a master plan for the site. <br />3. The County will provide topographical and land survey information, including site <br />boundaries, as needed. <br />4. The site layout alternatives presentation will not exceed two (2) hours and will beat the <br />County's Public Works office. <br />5. The preferred site layout presentation will not exceed one (1) hour and will beat the <br />County's Public Works office. <br />3 <br />23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P: 509.663.2711 ;iWWA[)g.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.