Laserfiche WebLink
Dept. of Public Works <br />Page 2 <br />material and we contracted with Baer Testing and requested that Ellensburg Cement Products <br />truck the material to our sites once the rock passes the testing. We are hoping to see some better <br />quality rock and will see some longer ROI on our chip seal. It will also allow us to maintain <br />some stockpile of rock to use for other projects. Discussion was held. <br />Board Direction: <br />Commissioner Osiadacz made a motion to approve the Resolution to Award the Bid for the <br />Manufacture and Supply of Aggregate for Bituminous Surface Treatment for One (1) <br />Calendar Year following Contract Execution. Commissioner O'Brien seconded the <br />motion. Resolution No. 2017-070 was approved as presented. <br />REQUEST TO APPROVE A RESOL UTION TO DELEGATE THE COUNTY ENGINEER <br />AUTHORITY TO LEGALLYBIND THE KITTITAS COUNTYPUBLIC WORKS <br />DEPARTMENT FOR THE PURPOSE OFREOUESTING FEDERAL TRANSPORTATION <br />Mark stated that the department received notice from the Federal Highway Administration that <br />last year the Federal Code registry was changed to require a particular certification for local <br />government relative to cost recovery on federal aid projects. Our current practice is that every <br />pay request is signed by either the Director of Public Works or the County Engineer. <br />Washington State Department of Transportation is requiring a Resolution be approved by the <br />Board of County Commissioners specifically noticing that the County Engineer is authorized to <br />be signing the vouchers and reimbursement requests. <br />Board Direction: <br />Commissioner Osiadacz made a motion to approve the Resolution to Delegate the County <br />Engineer Authority to Legally Bind the Kittitas County Public Works Department for the <br />Purpose of requesting Federal Transportation Project Reimbursement. Commissioner <br />O'Brien seconded the motion. Resolution No. 2017-071 was approved as presented. <br />FLOOD CONTROL ZONE DISTRICTADVISOR Y BOARD: <br />Mark stated that two weeks ago at study session staff discussed with the Board of County <br />Commissioners about the desire to bring some structure into the administration of the Flood <br />Control Zone District. Since the formation in 2012, there have been two completed and one near <br />completion watershed assessments that have identified numerous projects for eventual <br />implementation. Currently, the only strategy for choosing amongst the projects is the Flood <br />Control Zone District Administrator who could build a priority list and present it to the Board of <br />County Commissioners for consideration. Mark added that it is his opinion and a shared opinion <br />from the majority of the Board from the last discussion two weeks ago that a utility rate payer <br />based advisory board might be a favorable alternative to the other model. Given that the utility is <br />county wide and the type of projects are significantly different that a blended approach to <br />formation would be considered. This being made of up three rate payers from Upper County, <br />411 N. Ruby, Ste. #1 TEL (509) 962-7523 <br />Ellensburg, WA 98926 FAX (509) 962-7663 <br />