Laserfiche WebLink
Staff informed the Advisory Board that work is also being done by the current Airport <br />Consultant, CenturyWest, on the design of runway 7/25. Staff has collected survey data <br />including lighting, for a planned runway width of 60' and a length of 3600' more or less. <br />With the two projects running concurrently the only piece left to finalize will be a <br />funding source for the project. <br />FISCAL IMPACTS: <br />The cost of the third party review of runway 7/25 is not known at this time. <br />ATTACHMENTS: <br />Exhibit 1: Professional Engineering Services Handout from HLA <br />Page 2 of 3 <br />PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT <br />