Laserfiche WebLink
Washington State <br />Department of Transportation <br />Agreement No. (To be filled in by WSDOT Program Manager) <br />Task No. Amendment No. a Work Order No. <br />no <br />16ttitas County — Naneum Road - Bridge #89091 over the Highline Canal <br />rolect Manaeer n ormatron <br />Task Order <br />STATE Program Manager <br />Phone No. <br />Jim Henderson hende' wsdot.wa. ov <br />509-577-1960 <br />Mailing Address <br />Fax No. <br />2809 Rudkin Road <br />Union Gap, WA 98903-1648 <br />509-577-1959 <br />Kittitas County Project Manager <br />Phone No. <br />Luke Huck County Engineer <br />S09-%2-7018 <br />Lukas.Huck co.kittitas.wa.us <br />Mailing Address <br />Fax No. <br />411 North Ruby Street, Suite 1 <br />509-962-7663 <br />Ellensburg, WA 98926 <br />Scope of Task Order <br />Provide brief description of work to be performed and reference attachments to include proposed work schedules, a detailed cost estimate, <br />and any additional termstconditions. <br />Repairs; <br />Naneum Road Highline Canal Bridge #89091: WSDOT will replace all wood timbers, bents, piers, caps at mid span; pier 2 and repair <br />the undermined area at the south abutment. Repairs will include prep work, water diversion as warranted, cribbing forjacking, removing <br />existing wooden timbers, placing and securing new timbers, forming/grout work at the abutment and general site cleanup at the end of the <br />project. See attached photo of the area to be repaired. <br />WSDOT will provide labor, equipment, and repair materials for the work outlined above. <br />WSDOT will follow Regionally accepted Best Management Practices when working in environmentally sensitive areas unless other <br />direction is provided by the agency. <br />The Agency is responsible for waste materials resulting from the repairs and will clean-up the removed waste material. <br />The Agency will provide a mini excavator with operator for work in the canal and supplement labor for the project. <br />The Agency is responsible for any environmental/other required permitting and will permit the work accordingly. <br />The Agency will provide all necessary public notification & traffic control for the repairs. <br />The WSDOT will provide repair details, materials, equipment, and personnel to replace/repair noted items. <br />1/2 <br />