My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-27-minutes-public-works-study-session
>
Meetings
>
2017
>
03. March
>
2017-03-21 10:00 AM - Commissioners' Agenda
>
2017-02-27-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:44:17 PM
Creation date
5/12/2020 1:43:55 PM
Metadata
Fields
Template:
Meeting
Date
3/21/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
35566
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AdMk <br />Wo <br />nt shington State <br />Departmeof Transportation <br />COST ESTIMATE <br />Estimate Id: 27943 <br />DATE: <br />12/19/2016 <br />ORG CODE <br />455560 <br />LOCATION OF WORK <br />Naneum road Bridge #89091 <br />DESCRIPTION OF WORK: <br />Replace all timber in kind at bent on the Naneum road bridge. <br />ESTIMATE <br />LABOR DESCRIPTION QTY REG. HOURS O/T HOURS AMOUNT <br />Maintenance Lead Tech. <br />1 <br />60.0 <br />0.0 <br />$2,721.00 <br />Maintenance Mechanic 3 <br />7 <br />60.0 <br />0.0 <br />$17,140.20 <br />TOTAL LABOR ESTIMATE: $19,861.20 <br />EQUIPMENT TYPE QTY HOURS AMOUNT <br />0430 - Truck; 1 Ton; with Service Body; Gas <br />1 <br />50.0 <br />$227.50 <br />0827 - Less Than 38K GVWR; Crew Cab (Road Warrior) <br />1 <br />20.0 <br />$214.20 <br />0852 - Truck; Bridge Repair; without elevating platform <br />1 <br />50.0 <br />$433.50 <br />0853 - Truck; Bridge Repair Support; with Hydraulic boom <br />Crane; 54,000 GVW; 6x4 <br />1 <br />50.0 <br />$568.00 <br />TOTAL EQUIPMENT ESTIMATE: $1,443.20 <br />MATERIAL TYPE QTY AMOUNT <br />$0.00 <br />TOTAL MATERIAL ESTIMATE: $0.00 <br />MISCELLANEOUS CHARGES - DESCRIPTION QTY AMOUNT <br />steel and misc. parts <br />1.0 <br />$600.00 <br />timber 10" x 10" x 24' <br />2.0 <br />$794.52 <br />timber 10" x 12"x 26' <br />1.0 <br />$516.44 <br />timber 3" x 10" x 26' <br />2.0 <br />$258.22 <br />timber 6" x 10" x 24' <br />1.0 <br />$202.00 <br />TOTAL MISCELLANEOUS ESTIMATE: $2,371.18 <br />TOTAL CHARGES: $23,675.58 <br />MAINT. AREA LOCATION: <br />REGION <br />South Central <br />CONT. SECTION <br />WORK ORDER NO: <br />CREATED BY: DATE: <br />Jason Goetz 12/19/2016 <br />OFFICE USE ONLY: <br />Estimate Only: Y <br />Revised Estimate: N <br />Work Completed: N <br />Work Completed Date: <br />Page 1 DATE PRINTED: 12/19/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.