Milestone Report By Project <br />X = Milestone Complete <br />! = Critical Milestone <br />11MILESTO.RPT July 08, 2016 Page: <br />Acquisition Closing <br />12131(2016 <br />Stroh Right Bank Property (#3) <br />Recorded Land Survey to RCO <br />01/15/2017 <br />Papineau Property <br />Recorded Land Survey to RCO <br />01/15/2017 <br />Stroh Left Bank Property (#2) <br />Recorded Land Survey to RCO <br />01/15/2017 <br />Stroh Right Bank Property (#3) <br />I <br />Preliminary Design to RCO <br />01/31/2017 <br />For Stroh Property, as described in <br />RCO Manual 18 Appendix D-2 and <br />agreement special conditions <br />(Preliminary Design Report, Drawings, <br />and Engineering Cost Estimate <br />attached in PRISM) <br />Recorded Acq Documents to RCO <br />02/01/2017 <br />Papineau Property <br />Recorded Acq Documents to RCO <br />02/01/2017 <br />Stroh Left Bank Property (#2) <br />Recorded Acq Documents to RCO <br />02/01/2017 <br />Stroh Right Bank Property (#3) <br />I <br />Cultural Resources Complete <br />02/14/2017 <br />for future ground disturbance or <br />structure demotiion <br />Stewardship Plan to RCO <br />02/15/2017 <br />Applied for Permits <br />03/15/2017 <br />Progress Report Submitted <br />03/31/2017 <br />i <br />Agreement End Date <br />06/01/2017 <br />PROJECT CLOSING. All expenditures <br />must be prior to this date. <br />Final Billing to RCO <br />06/15/2017 <br />Progress Report Submitted <br />06130/2017 <br />X = Milestone Complete <br />! = Critical Milestone <br />11MILESTO.RPT July 08, 2016 Page: <br />