My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-25-minutes-public-works-study-session
>
Meetings
>
2017
>
02. February
>
2017-02-07 10:00 AM - Commissioners' Agenda
>
2016-04-25-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:42:59 PM
Creation date
5/12/2020 1:40:05 PM
Metadata
Fields
Template:
Meeting
Date
2/7/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
34676
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dept. of Public Works <br />Page 2 <br />under design now as we have a construction deadline of <br />fiscal ending 2017. <br />Board Direction: Commissioner Jewell moved to approve Resolution <br />2016-057 as presented. Commissioner O'Brien <br />seconded the motion. Resolution 2016-057 was <br />approved as presented. <br />REQUEST TO APPROVE A <br />RESOLUTION TO AUTHORIZE <br />THE DIRECTOR'S SIGNATURE <br />ON TASK ORDER NO. 2 FOR <br />ENVIRONMENTAL PERMIT <br />SERVICES SUPPORTING <br />THE DESIGN OF TEANAWAY <br />HYDRAULIC IMPROVEMENTS: <br />Mark stated that the next piece supports the action the <br />Board just took in that the on call consultant ESA has <br />provided us with a scope of work supporting the biological <br />assessment necessary to complete the three culvert <br />replacements and one bridge replacement for the <br />Teanaway Hydraulic Improvements. Commissioner Jewell <br />inquired as to the biological assessment and the necessity <br />of the assessment due to the fact that it is federal grant <br />funds for the project. <br />Board Direction: Commissioner Jewell moved to approve Resolution <br />2016-058 as presented. Commissioner O'Brien <br />seconded the motion. Resolution 2016-058 was <br />approved as presented. <br />REQUEST TO APPROVE A <br />RESOLUTION TO DECLARE <br />A LOCAL EMERGENCY FOR <br />CULVERT REPAIR AT LODGE <br />CREEK ON VIA KACHESS <br />ROAD AND REQUEST TO <br />APPROVE A RESOLUTION <br />TO AUTHORIZE THE <br />DIRECTOR'S SIGNATURE <br />ON A DESIGN TASK ORDER <br />WITH JACOBS TO PROVIDE <br />SUPPORT IN THE LODGE <br />CREEK CULVERT <br />REPLACEMENT PROJECT. <br />411 N. Ruby, Ste. #1 <br />Ellensburg, WA 98926 <br />Mark reported that he has previously briefed the Board on <br />the Lodge Creek culvert failure at Via Kachess. The <br />project was put on this year's annual construction program <br />but the culvert has failed. The area is barricaded to keep <br />TEL (509) 962-7523 <br />FAX (509) 962-7663 <br />
The URL can be used to link to this page
Your browser does not support the video tag.