Laserfiche WebLink
safety by protecting existing roadside hazards <br />with guardrail. <br />Public Works is currently proposing that the <br />additional $413,240.00 that is needed to deploy <br />all guardrail along Huntzinger from MP 0.24 to <br />MP 2.70 be included in the annual construction <br />budget for 2017 <br />INTERACTION: Public Works <br />RECOMMENDATION: Motion to approve the Resolution to Award <br />the Westside Road Traffic Safety <br />Improvements Project contract and authorize <br />the Director of Public Works to sign said <br />contract documents. <br />HANDLING: Return a copy of the Resolution to Public <br />Works. <br />ATTACHMENTS: Resolution, Bid Tabulations <br />LEAD STAFF: Luke Huck, County Engineer <br />