My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-28-minutes-public-works-study-session
>
Meetings
>
2016
>
12. December
>
2016-12-06 10:00 AM - Commissioners' Agenda
>
2016-03-28-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:37:08 PM
Creation date
5/12/2020 1:36:05 PM
Metadata
Fields
Template:
Meeting
Date
12/6/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
33390
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROAD AND BRIDGE DESIGN <br />Sargent will prepare the design to improve the road by removing the existing bridge and installing a new <br />bridge. Sargent Engineers will prepare the design for the bridge. The design will follow the requirements of <br />the AASHTO LRFD Bridge Design Specifications. <br />PLANS <br />Sargent Engineers will prepare the plans for the replacement of the bridge. The plans will follow the format <br />that the County desires. They shall include at a minimum: <br />• Cover Sheet <br />• Quantities Sheet <br />• Roadway Layout Sheet <br />• Roadway Details <br />• Bridge Layout <br />• Foundation Plan <br />• Abutment Details <br />• Framing Plan <br />• Girder Details <br />• Guard Rail Details <br />SPECIFICATIONS <br />Sargent Engineers will prepare the specifications in WSDOT format using WSDOT bid items. <br />ESTIMATE <br />Sargent Engineers will prepare an estimate for the project. <br />LOAD RATING <br />Sargent Engineers will prepare a load rating that conforms to Chapter 13 of the WSDOT Bridge Design <br />Manual. <br />AS BUILT PLANS <br />Once the project is complete, as -built plans will be prepared for the bridge. <br />Sargent will submit plans for review to the County at the 60%, and 90% stages for review and comment. <br />BIDDING AND CONSTRUCTION ADMINISTRATION <br />The County will conduct the bidding and administer construction. <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.