My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-28-minutes-public-works-study-session
>
Meetings
>
2016
>
12. December
>
2016-12-06 10:00 AM - Commissioners' Agenda
>
2016-03-28-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:37:08 PM
Creation date
5/12/2020 1:36:05 PM
Metadata
Fields
Template:
Meeting
Date
12/6/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
33390
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />Scope of Work <br />This project involves the improvement of No. 6 Road by replacing the bridge over Towne Ditch. The <br />Consultant will survey the site, perform a geotechnical investigation, obtain the environmental permits, <br />evaluate the scour at the bridge, and prepare the contract documents for replacing the bridge. This project <br />is being funded by CRAB. <br />LAND SURVEYING <br />Gray and Osborne will perform the land survey. <br />Task 1: Topographic Survey <br />Objective: To obtain vertical and horizontal control necessary for design of replacement of No. 6 Road <br />Bridge. The work shall include identifying existing bridge, utilities, topography, road alignment, and other <br />related site topography. <br />1. Establish vertical and horizontal control for survey and mapping at a scale of 1 "=20' horizontal. <br />Control shall be referenced to the Washington State Plane coordinate system NAD 83/11, <br />NAVD88. <br />2. Acquire topographical and planimetric survey of site (right-of-way to right -of way, + 25 feet each <br />side) to include establishing surface grades and grade breaks, ditch profiles, pavement edges, <br />utility poles, hydrants, valves, fences, trees, significant landscaping, existing driveways, mailboxes, <br />road signs, road channelization, and existing utilities as located in sufficient detail to support <br />adequate design. <br />3. Acquire "off-site" survey of No. 6 Rd (to approximately 250 feet beyond existing bridge) to facilitate <br />bridge approach and pavement transitions. <br />4. Notify 1 -call and obtain topographic survey of located utilities. <br />5. Provide electronic survey data in Civil3D 2014 format containing survey points with descriptions, <br />lines, layers, grade lines, and symbols provided by Gray & Osborne, Inc. <br />Task 2: Right of Way and Property Boundary Determination <br />1. Acquire public "records of survey plat maps, assessor maps, "as-builts", etc. as may be available. <br />2. Physically locate available local monumentation and fix to project control to accurately tie record <br />boundary surveys and information to project datum. <br />3. Obtain title reports in the form of Subdivision Guarantees for the 4 properties directly adjacent to <br />the site identifying last known deed, ownership, and existing easements and encumbrances that <br />may affect the project area. <br />4. Provide electronic boundary data in Civil3D 2014 format containing right of way margins, adjacent <br />parcel boundaries, County parcel numbers, house numbers and pertinent notes on survey <br />methodology. <br />Services not included under this task <br />1. Any services associated with acquisition of property or staking of right of way. <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.