My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-28-minutes-public-works-study-session
>
Meetings
>
2016
>
12. December
>
2016-12-06 10:00 AM - Commissioners' Agenda
>
2016-03-28-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:37:08 PM
Creation date
5/12/2020 1:36:05 PM
Metadata
Fields
Template:
Meeting
Date
12/6/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
33390
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br />Exhibit D <br />Consultant Fee Determination <br />Project: Taneum Road Bridge Revisions <br />_. <br />- <br />- _— <br />Project! <br />Design <br />Principal_ <br />Engineer <br />Engineer <br />Drafter IIS <br />Task Cost <br />_ <br />_ --. <br />Rate $162.93 <br />$123.43 <br />$8887 <br />$8887 <br />..._ <br />60% Documents <br />-- <br />-......... <br />Site Investigation _._ <br />8 <br />$1,303 <br />Design abutments <br />! <br />! <br />16; <br />$1,422 <br />Prepare foundation plan <br />1t.� <br />8. <br />$800 <br />Prepare abutment sheets - <br />? <br />16 <br />$1,511 <br />Prepare quantities <br />I <br />41 <br />$355 <br />Prepare cost estimate <br />2� <br />$178 <br />90% Documents <br />Attend Invest n s- -_- _ -----_ _ <br />- - 7i <br />- - <br />--�——� <br />i <br />'-- <br />$1,141 <br />Check design <br />_ <br />$98_7_ <br />-- <br />Check drawings <br />9 <br />i <br />1 <br />r <br />12 <br />$1 190 <br />Check,quantties ......_ ............. <br />- <br />_ -. _ <br />4 <br />............._8+ <br />--_-_. <br />r <br />... <br />$494 <br />Check cost estimate <br />21 <br />$247 <br />Pians, Specifications and Estimate <br />_-11 <br />}I <br />Make changes to plans, specifications and estimate----- <br />2� <br />6 <br />8 <br />8, <br />$2,735 <br />Produce bid document originals <br />i <br />4 <br />8 <br />8' <br />$1,916 <br />Load Rap Bd9e <br />.-^4� <br />$1205 <br />As built plans <br />— <br />I` —� <br />4 <br />20, <br />$2,133 <br />Total Direct Salary Cost <br />17: <br />a1. <br />52 <br />72I <br />577 616 <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.