Laserfiche WebLink
August 19, 2015 <br />[Part 25.45 allows for the goal to be set 1 of 5 di Brent methods. The example ;provided below <br />is the most often used and recommended. The DBE Program Regulation can be found at <br />httoYAw—wr.dot.aovlosdbuldisadvantasted-business-enfemrrse or <br />httrsYA~.ecfr.ao6k2Eb1n/tex dx?tnl-fecfrbrowsaMffe49/49cfi26 main 02.tQ1 <br />Method: Use DBE Directories htto:llwww.dot,goviosdbu/disadvantaged- Lisiness- <br />entemriselstate-dot-and-dbe-orociram-webafts <br />and Census Bureau Data htiv:/twww.census.govleconlcbdindex.html <br />[icor each Contract and each fiscal year, please provide the following information] <br />_ NAICS <br />- ---- <br />Type of Work --- Total DBE's Total All Firms <br />541330 <br />Engineering 0 40 <br />Services <br />Total <br />0 40 <br />Divide the total number of DBE's by the total number of All Firms = base figure for each <br />contract (Weighting is not mandatory, but Is encouraged for a move accurate base figure) <br />Base figure = 0% of all firms ready, willing and able. <br />The data source or demonstrable evidence used to derive the numerator was: a search of the <br />Oregon State Certification directory (OMWESB Certifrcatian Management System) for each of <br />the NAICS codes in a four county area. <br />The data source or demonstrable evidence used to derive the denominator was: a search of US <br />Census Bureau data for the number of businesses registered for each of the NAICS codes in a <br />four county area. <br />Step 2. 2SA5(d): Adjustments to Step I base figure. <br />After calculating a base figure of the relative availability of DBEs, evimace was examined to <br />determine what adjustment (if any) was needed to the base figure in order to arrive at the <br />Overall goal <br />An examination of the anticipated contracts for each fiscal year, the availability of the DBE firms <br />by trade classification and the volume of work performed by DBE firms over previous years. <br />Pegs 27 of 44 <br />