Laserfiche WebLink
DOT RGGBOI <br />PS6E JOB No :16X308 <br />REVISION 0 - <br />CONTRACT NO :008688 <br />REGION NO :4 <br />VERSION RD :2 <br />WOW OADER6 ; XIA642 <br />HNY :6R 142 <br />20,000.00 <br />TITLE :SR 142 <br />KLICKITAT RIVER BRIDGE <br />REPLACE BRIDGE <br />16X306 <br />21 GRAVIL BACKFILL FOR BALL <br />PROJBCT , 9TP8-014210231 <br />140.0000 C.Y. <br />COUNTYf81-.KLICKITAT <br />ITIK ITEM DHSCRIPTXON <br />UNIT <br />NO. HST, QUANTITY <br />MEAS <br />RRSHINGTON STATE DEPARTMENT OF TRANSPORTATION DATE: 03/'5/2016 <br />+ . • BID CHECK REPORT • • • TIE03: 07:57 <br />RIDS OPENED ON : <br />AXMWD ON ; Apr 25 2016 <br />------- LOW BIDDER ------- 2ND BIDDER - ------- 3RO BIDDER ------- <br />N.J. HUGHES CONSTRUCTION, INC LZAACr CONTRACTING, INC. CASCADR BRIDGE LLC <br />11510 WE 87TH AVE 41850 KINGSTON JORDAN RD 14215 NK 3RD COURT <br />97383-9704 <br />VANCOUVER IIA 986621345 STAYTON OR 973833000 VANCOUVER 1B 966855760 <br />CONTRACTOR R08BHR : 100214 CONTRACTOR NUIIDER : 100873 CONTRACTOR 110NBSR : 1OD412 <br />INGR'S. RST. <br />PRICE PER UNIT/ PRICE PER UNIT/ 0 DIFF./ PRICE PER UNIT/ 4 DIFF.J PRICE PER UNIT/ 4 DIFF./ <br />TOTAL AMOUNT TOTAL AMOUNT ANT.DIFF. TOTAL AMOUNT AHT.DIFF. TOTAL AMOUNT ANT.DIFF. <br />STRUCTURE <br />19 RUCK EXCAVATION FOR SHAFT INCLUDING HAUL <br />28.0000 C.Y. <br />1,000.0000 <br />20,000.00 <br />20 SHORING OR EXTRA EXCAVATION CL. A HR. 190. 142/9 <br />L.B. <br />30,000.00 <br />21 GRAVIL BACKFILL FOR BALL <br />140.0000 C.Y. <br />45.0000 <br />6,300.00 <br />22 FURNISHING 6 PLACING TEMP. CASING E(,P, 4-0" DIA. SHAFT <br />150.0000 L.F. <br />100.0000 <br />15,000.00 <br />23 FUEWIBX=G FE309=NT CASING FOR V-0- DIAN. SAAFT <br />22.0000 L.F. <br />500.0000 <br />11,000.00 <br />24 PLACING PERMANENT CASING FOR 41-0" DIM. SHAFT <br />2.0000 FACE <br />5,000.0000 <br />10,000.00 <br />25 CASINO smoRINO <br />45.0000 L.F. <br />100.0000 <br />4,500.00 <br />26 ST. RSINF. BAR FOR BRIDGE <br />22500.0000 LB. <br />1.2000 <br />27,000.00 <br />27 ST. RHINF. BAR FOR SHAFT <br />39000.0000 LE. <br />1.2000 <br />46,800.00 <br />28 CSL ACCESS TUBE <br />990.0000 L.F. <br />8.0000 <br />7,920.00 <br />29 CONC. CLASS 4000 FOR KRIM <br />130.0000 C.Y. <br />650.0000 <br />64,500.00 <br />3,000.OD00 206.006 <br />84,000.00 56,000.00 <br />-90.83% <br />2,750.00 -27,250.00 <br />40.0000 -11.11 6 <br />5,600.00 -700.00 <br />1.0000 -99.00 t <br />150.00 -14,650.00 <br />350,0000 -30,004 <br />7,700,00 -3,306.00 <br />7,500.0000 50,006 <br />15,000.00 5,000.00 <br />55.0000 -45,004 <br />2,475.00 -2,025,00 <br />2.OD00 66.671 <br />45,000.00 SB,060,00 <br />2.3000 91.676 <br />89,700.00 42,900.00 <br />2.3000 -71.256 <br />2,277.OD -5,643.00 <br />715.0000 10.00% <br />92,950,00 8,450.00 <br />5,075.0000 407,50 4 <br />142,100.00 114,100.00 <br />-65.83 4 <br />10,250.00 -19,750.00 <br />68.9506 53.224 <br />9,653.00 3,353.00 <br />41.0000 -59.004 <br />6,150.00 -8,850.00 <br />370.0000 -26.00% <br />6,140.00 -2,860.00 <br />6,500.0000 70.00% <br />17,000.00 7,000.00 <br />390.0000 290,00% <br />17,550.00 13,050.00 <br />1.2500 4.17 t <br />28,125.00 1,125.00 <br />1.5500 29.17 t <br />60,450.00 13,650.00 <br />9.9500 24.38 4 <br />9,850.50 1,930,50 <br />925.0000 42.314 <br />120,250.00 35,750.00 <br />2,500.0000 150.004 <br />70,000,00 42,000.00 <br />83.33 6 <br />55,000,00 25,000.00 <br />130.000C 188.894 <br />18,200.00 11,900.00 <br />1.0006 -99.004 <br />150.00 -14,850.00 <br />285.0000 -43.009 <br />6,270.CC -4,730,00 <br />5,100.00CC 2.001 <br />10,200.00 200.00 <br />1.0000 -99.004 <br />45.00 -4,455.00 <br />1.2506 4.174 <br />28,125.00 1,125.0C <br />1.2500 4.176 <br />48,750.00 1,950.00 <br />7.7500 -3.139 <br />7,672.50 -247,50 <br />950.0000 46,15% <br />123,500.00 39,000,00 <br />