|
DOT almol
<br />PSGE JOB NO :16X308 REVISION NO
<br />CON2RRcT NO : 008085 REGION NO : 4
<br />VERSION NO :2 WORK ORDERS :XL4642
<br />HNY ;SR 142
<br />TITLE :SR 142
<br />KLICKITAT RIVER $RIDGE
<br />REPLACE BRIDGE
<br />16X308
<br />PROJECT , STPD -0142 X023)
<br />CDURTR(H) :KLICKITAT
<br />ITEM ITEM DESCRIPTION UNIT
<br />NO, EAT. QUANTITY MEAS
<br />GRADING
<br />11 EFflmmoaNT COMPACTION
<br />450.COOC C.Y.
<br />DRAINAGE
<br />12 QUARRY SPALLS
<br />155.0000 TON
<br />13 UNDERDRAIN PIPS 6 IN. DIM.
<br />60.0000 1. r.
<br />14 CL. V REINF. CONC. CULV. PIPS 18 IN. DIAM,
<br />117.0000 L. F.
<br />STORM SEWER
<br />15 CATCH BASIN TYPE 1
<br />3.0000 EACH
<br />16 SCHEDULE A STORM SEWER PIPE 12 IN. DIM.
<br />89.0000 L.F.
<br />WASHINGTON STATE DEPAPMCM OF TRANSPORTATION
<br />DATffi: 03/24/X16
<br />• • • BID CHECK REPORT x • ♦
<br />-600.00
<br />T71R: 07:57
<br />35.564
<br />BIDS OPENED ON ;
<br />1,424.00
<br />AWARDED ON : Apr 25 2016
<br />------- LOW BIDDER -------
<br />2ND BIDDER -------
<br />------- 3RD BIDDER -------
<br />N.J. HUGHES CONSTRUCTION, INC
<br />LEGACY OONT'RACTING, INC.
<br />CASCADE BRIDGE LLC
<br />11510 HE 87TH AV2:
<br />41650 KINGSTON JORDAN RD
<br />14215 HN 3RD COURT
<br />97383-9704
<br />VANCOUVER WA 986621345
<br />STAYTDN OR 973633000
<br />VANCOUVER WA 986855760
<br />CONTRACTOR NUi09ER 100214
<br />CONTRACTOR N01BER 100073
<br />CONTRACTOR HOIG R 100412
<br />ENGR'a. EST.
<br />PRICE PBR UNIT/ PRICE PER UNIT/ 4 DIFF./
<br />PRICE PER UNZT/ 4 DIFF./
<br />PRICE PER UNIT/ 4 DINE/
<br />TOTAL AMOUNT TOTAL AMOUNT AW.DIST.
<br />TOTAL AMOUNT ANT.DIFF_
<br />TOTAL AMOUNT ANNT.DITT.
<br />5.0000
<br />2,230.00
<br />45.0000
<br />6,975.00
<br />25.0000
<br />1,500.00
<br />125.0000
<br />14,625.00
<br />2,250.0000
<br />6,750.00
<br />45.0000
<br />4,005.00
<br />6.0000 20.009 11.9500 139.008
<br />2,700.00 450.00 5,377.50 3,127.50
<br />30.0000 -33.334
<br />4,650.00 -2,325.00
<br />15.0000 -40.004
<br />900.00 -600.00
<br />100.0000 -20.004
<br />11,70D.00 -2,925.00
<br />1,200.0000 -46.674
<br />3,600.00 -3,150.00
<br />40.0000 -11.11 4
<br />3,560.00 -445.00
<br />STRUCTURE
<br />17 STRUCTURE EKCAVATION CLASS A INCL. HAUL
<br />192.0000 C.Y. 25.0000 35.0000 40.004
<br />4,800.00 6,720.00 1,920.00
<br />16 SOIL KXCAVATION AM SHAFT INCLUDING HAUL
<br />96.0000 C.Y. 500.0000 1,500.0000 200.004
<br />48,000.00 144,000.00 96,000.00
<br />34.5000 -23.33 4
<br />5,347.50 -1,627.50
<br />20.5000 -10,00%
<br />1,230.00 -270.00
<br />87.5000 -30.000
<br />10,237.50 -4,387.50
<br />1,700.0000 -24.44 4
<br />5,100.00 -1,650.00
<br />73.2500 62.704
<br />6,519.25 2,514.25
<br />32.7500 31.00%
<br />6,288.00 1,488.00
<br />1,900.0000 280.0016
<br />182,400.00 134,400.00
<br />1.5500 -69.004
<br />697.50 -1,552.50
<br />33.0000 -29.67%
<br />5,115.00 -1,060.00
<br />27.0000 8.004
<br />1,620.00 120.00
<br />52.0000 -34.404
<br />9,594.00 -5,031.00
<br />2,050.0000
<br />-8.894
<br />6,150.00
<br />-600.00
<br />61.0000
<br />35.564
<br />5,429.00
<br />1,424.00
<br />95.0000 280.004
<br />18,240.00 13,440.00
<br />1,330.0000 166.00$
<br />127,680.00 79,680.00
<br />
|