My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-13-minutes-public-works-study-session
>
Meetings
>
2016
>
11. November
>
2016-11-01 10:00 AM - Commissioners' Agenda
>
2016-06-13-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:37:23 PM
Creation date
5/12/2020 1:33:56 PM
Metadata
Fields
Template:
Meeting
Date
11/1/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
32766
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Perform Floodplain Mapping <br />The CTP may consider including and completing this task in the MIP if the CTP believes data will need to <br />be submitted during the course of the project, even if this task was not included in the MAS In addition, <br />leveraged floodplain mapping data must be documented and submitted for this task Failure to submit <br />this task when data should have been submitted could result in the workflow being reverted back to <br />production tasks and could lead to a delay in the schedule. If the CTP obtains floodplain mapping data <br />that was not included in the MAS, the CTP shall contact the region to submit a change request to include <br />the task and leverage as part of the award and request that this task be added to the MIP workflow. <br />Responsible Mapping Partner: Kittitas County Public Works <br />Scope for Base Level StudX: The CTP shall delineate the 1 percent and 0.2 percent annual chance <br />floodplain boundaries and any other applicable elements for the flooding sources for which hydrologic, <br />detailed hydraulic, and/or coastal analyses were performed. The CTP shall incorporate all new or revised <br />hydrologic, hydraulic, and/or coastal modeling and shall use the topographic data acquired under Develop <br />Topographic Data to delineate the floodplain and regulatory floodway boundaries on a digital work map. <br />Scope for Detailed Riverine or Coastal Anal: The CTP shall delineate the 1 percent and O.percent <br />annual chance floodplain boundaries and the regulatory floodway boundaries (if required) and any other <br />applicable elements for the flooding sources for which hydrologic, detailed hydraulic, and/or coastal <br />analyses were performed. (Insert language to make it clear if there will be AE or A zones with floodways <br />or BFE's on the FIRM, etc.)} The CTP shall incorporate all new or revised hydrologic, hydraulic, and/or <br />coastal modeling and shall use the topographic data acquired under Develop Topographic Data to <br />delineate the floodplain and regulatory floodway boundaries on a digital work map. <br />Scope for Refinement or Creation of Zone A: The CTP shall delineate the 1 percent and 0.2 percent <br />annual chance floodplain boundaries for the flooding sources in the Scoping Report. The CTP shall use <br />existing topographic data or the topographic data acquired under Develop Topographic Data to delineate <br />the floodplain boundaries on a digital work map. All Zone A boundaries must be supported with a model. <br />The CTP shall incorporate the results of all effective Letters of Map Change (LOMC) for all affected <br />communities on the FIRM and provide to the appropriate PTS the required submittals for incorporation <br />into the National Flood Hazard Layer (NFHL). Also, the CTP shall address all concerns or questions <br />regarding Floodplain Mapping that are raised during the independent QA/QC review. <br />The CTP shall capture flood hazard engineering and/or mapping data quality issues encountered during <br />this activity in the CNMS database for the area(s) of interest. These issues will be entered as "Requests" <br />or "Needs" in the CNMS requests feature dataset based on the nature of the deficiency encountered. <br />Detailed information on performing this task can be found in the relevant standards specified in Section 5 <br />— Standards. <br />The CTP will provide the data to FEMA, at the time of FIRM data submission, to update the Mid -Term <br />Levee Inventory (MLI). <br /><Add additional details regarding the scope of these activities, as appropriates <br />Standards: All floodplain mapping work shall be performed in accordance with the standards specified in <br />Section 5 — Standards. The CTP will perform self -certification audits for the Floodplain Boundary <br />Standards for all flood hazard areas. <br />National FYI Flood Risk Project MAS Template Version 1.0 <br />Mapping Activity Statement No. (MASNo 1 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.