Laserfiche WebLink
Existing survey data, or as -built data, may be used to produce flood studies and related products. <br />However, if existing data are to be collected, the FEMA Region should be consulted before leveraging the <br />best available existing survey data to ensure acceptability for the intended level of flood hazard study. <br />Stream reaches are evaluated and prioritized for streamflow gage deployment. Cross sections are <br />surveyed and rating curves produced at each gage location. <br />Standards: All Field Survey work shall be performed in accordance with the standards specified in <br />Section S – Standards. <br />Deliverables: The CTP shall make the following products available to FEMA by uploading the digital <br />data to the MIP, in accordance with the schedule outlined in Section 6. Where paper documentation is <br />required by state law for professional certifications, the CTP may submit the paper in addition to a <br />scanned version of the paper for the digital record. Please coordinate with the regional and/or state <br />representative to verify state reporting requirements <br />o Digital photographs of cross section locations and structures <br />• Digital sketches of cross section and structure data <br />• Documentation of the horizontal and vertical datum <br />• Digital versions of draft text for inclusion in the FIS report <br />• Digital survey data consistent with the Data Capture Technical Reference <br />• Metadata file complying with the NFIP Metadata Profiles Specifications <br />• Support documentation <br />• Certification of Work <br />• TSDN Narrative <br />• FIRM Database files <br />• A Summary Report that describes and provides the results of all automated or manual QA/QC <br />review steps taken as outlined in the approved QA/QC Plan. <br />Develop Hydrologic Data <br />CTPs may consider including and completing this task in the MIP if the CTP believes data will need to be <br />submitted during the course of the project, even if this task was not included in the MAS. In addition, <br />leveraged hydrologic data must be documented and submitted to the MIP for this task Failure to submit <br />this task when data should have been submitted could result in the workflow being reverted back to <br />production tasks and could lead to a delay in the schedule. If the CTP obtains hydrologic data that was <br />not included in the MAS, the CTP shall contact the region to submit a change request to include the task <br />and leverage as part of the award and request that this task be added to the MIP workflow. <br />Responsible Mapping Partner: Kittitas County Public Works <br />.Scone: The CTP shall perform hydrologic analyses for the flooding source(s) identified in Table 1.7— <br />Summary of Hydrologic Analyses. Hydrologic analysis activities include the determination of peak flood <br />discharges, the use of rainfall -runoff models, regression equations, gage analysis, and hydrograph <br />National FY16 Flood Risk Project MAS Template Version 1.0 <br />Mapping Activity Statement No. {MASNo } 11 <br />