Laserfiche WebLink
Updated <br />Effective <br />W## <br />New = ## <br />AE <br />AE _ ## AE _ ## <br />Studies <br />Updated <br />Effective <br />Surge <br />Leverage <br />A—## <br />A = ## A = ## <br />## <br />d = ## <br />Studies <br />New <br />Studies <br />Wave __ <br />New = ## <br /># <br />## <br />Identified <br />New <br />Studies <br />Surge= <br />Leverage <br />A = ## <br />## <br />d = ## <br />Identified <br />*Details on type of study are documented in the Flood Risk Project recommendations section of the <br />Discovery Report Deliverable. <br />This Flood Risk Project will be completed by the following entities: <br />• Kittitas Public Works; <br />• Watershed Science and Engineering; <br />The CTP shall notify FEMA and all applicable parties of all meetings with community officials, and other <br />relevant meetings, at least two weeks prior to the meeting (with as much notice as possible). FEMA <br />and/or its contractor may or may not attend the community meetings. <br />The CTP shall maintain an archive of all data submitted. All supporting data must be retained for three <br />years from the date a funding recipient submits its final expenditure report to FEMA. <br />The CTP is responsible for the implementation of an independent Quality Assurance/Quality Control <br />(QA/QC) plan for all assigned activities. The CTP will submit a Summary Report that describes and <br />provides the results of all automated or manual QA/QC review steps. The report should include the <br />process for all assigned activities. <br />Independent QC review activities may be performed by the CTP or FEMA's contractor at the discretion <br />of FEMA. If the CTP will be responsible for the QC review, the entity that will perform QC should be <br />identified in this NMS. The CTP will need to submit its QC plan to the Regional Project Officer for <br />approval. <br />Please note FEMA will also be performing periodic audits and overall study/project management to <br />ensure quality, including National Quality Reviews (QR) required per FEMA standards for all flood risk <br />projects. Whether or not the CTP performs the Independent QC review mentioned in the preceding <br />National FY16 Flood Risk Project MAS Template Version 1.0 <br />Mapping Activity Statement No. (MASNo 1 4 <br />