My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-12-minutes-public-works-study-session
>
Meetings
>
2016
>
10. October
>
2016-10-04 10:00 AM - Commissioners' Agenda
>
2016-09-12-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:31:45 PM
Creation date
5/12/2020 1:31:25 PM
Metadata
Fields
Template:
Meeting
Date
10/4/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
32188
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dept. of Public Works <br />Page 2 <br />LOWER COUNTY SHOP <br />ENVIRONMENTAL SAMPLING: Lower County Shop Environmental Sampling — Mark <br />received an email from the Washington State Department <br />of Ecology regarding soil retesting at the Lower County <br />Shop. Previous to this inquiry the City of Ellensburg <br />contracted with TerraGraphics Environmental Engineering <br />through the Brownfields program to identify potential soil <br />and/or groundwater contamination at the site. A Phase 2 <br />Environmental Site Assessment identified some <br />contamination and called for the installation of groundwater <br />monitoring wells and continued sampling. The depth of the <br />well was drilled at 15 feet, however, the well did not <br />produce groundwater, and therefore no sampling could be <br />conducted. Mark suggested checking the groundwater <br />levels before responding to DOE's request to retest. <br />Board Direction: Check groundwater levels and then contact DOE. <br />PROJECT UPDATES: Luke reported that Via Kachess Road would be closing <br />tonight to start the Lodge Creek culvert replacement. <br />Culvert delivery is scheduled for tomorrow and will work <br />around the WSDOT construction to get it delivered. Staff <br />did received some phone calls saying they were not <br />informed but the Department sent out letters and <br />conducted a meeting at the Homeowner's Association Club <br />House and placed signage. The Forest Service gave <br />approval to improve one of the Forest Service Roads to act <br />as a detour route and one person complained about the <br />state of the road. Staff will meet onsite with the Forest <br />Service next week to discuss the issues. <br />Luke stated that the Mt. Daniels Drive extension was in <br />final design. Letters were sent to the neighboring property <br />owners and staff has received no questions. We were able <br />to preserve some trees and the Lower County Crew will <br />begin brushing the site next week. Staff is waiting for the <br />SEPA approval and he is hoping to get started on October <br />1st. It should be a one (1) to two (2) week project. <br />Luke was able to get WSDOT to review the Westside Road <br />project documents and the STIP updated. Funds should <br />be obligated soon and will be placing a Notice of Call for <br />Bids on Tuesday's agenda for consideration. <br />Silica Road Bridge Plans have been approved and staff is <br />looking at an October 10, 2016 delivery date. The WSDOT <br />411 N. Ruby, Ste. #1 TEL (509) 962-7523 <br />Ellensburg, WA 98926 FAX (509) 962-7663 <br />
The URL can be used to link to this page
Your browser does not support the video tag.