Laserfiche WebLink
2. They cannot increase the proportionate share of the cost to be borne by assessments <br />from the proportion stated in the notice. <br />3. Finally, the board cannot change the boundaries of the district to include property not <br />previously included therein.. <br />If the board finds that they need to do any one of the above items, then they must first pass a <br />new resolution of intention and give a riew notice to all property owners in the manner and form <br />and within the time provided for the original notice. <br />After IRID Formation and on to the 3oad Sale <br />Following are both statutory and intuitive steps that need to be followed after the RID has been <br />formed and the improvement ordered by the board. Generally, this part of the RID process is <br />identical to that for LIDs. Therefore, other chapters of this LID/RID Manual will be very helpful <br />in completing the RID process, particularly the post -formation sections of Chapter 3 and all of <br />Chapters 4 and 5. <br />The outline that follows contains the statutory reference for those steps that are mandatory. <br />❑ Prepare and consider State Environmental Policy Act (SEPA) review (RCW 43,120) or <br />formally determine absence of need for it. This step may be required prior to adopting <br />the resolution of creation if adoption of formation resolution is a final decision to <br />undertake construction. <br />❑ Authorize and undertake the final engineering and design work. <br />❑ Publish call for bids for construction once a week for two consecutive weeks before bid <br />opening. (RCW 36.88.320 and 36.77.020) <br />❑ Board receives bids and obtains analysis of bids and recommendation from the county <br />engineer. <br />❑ Board accepts best bid and awards contract. (RCW 36,77.040) or <br />0 Board authorizes construction by county's own crews to proceed as 'day labor'. <br />(RCW 36.77.065 and RCW 36.77.070) <br />❑ Upon completion of the project, obtain when necessary state clearances, accept work and <br />determine total RID costs, (RCW 60.28.040, 61.12.050 and 36.88.300) <br />❑ County engineer prepares proposed final assessment roll based upon total actual costs <br />and files it with the clerk of the board. (RCW 36.88.090) <br />❑ The board adopts a resolution setting time, date, and place of final assessment roll <br />hearing before the board of county commissioners who will be sitting as a board of <br />equalization. (RCW 36.88.030) or <br />❑ RCW 36.88.095 a;lows board to appoint a committee or officer to hear final assessment <br />roll and forward recommendations to the board. <br />Local and Road Improvement Districts Manual for Washington State Sixth fdiNon 81 <br />