My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-25-minutes-public-works-study-session
>
Meetings
>
2016
>
10. October
>
2016-10-04 10:00 AM - Commissioners' Agenda
>
2016-01-25-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:31:19 PM
Creation date
5/12/2020 1:30:23 PM
Metadata
Fields
Template:
Meeting
Date
10/4/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
32188
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 1- Review Background Information <br />WSE will review each funders application procedures, requirements, and instructions. WSE staff will also <br />coordinate with project partners to galn abetter understanding of expected roles and funding/match <br />requirements. <br />Task 2 - Manestash FbD Pre -Application (due 1/29/16) <br />WSE will review the project description, details, and budget, along with basin background information <br />(recovery plan, corridor plan, etc.) WSE will also discuss roles and funding with partner agencies. <br />WSE will modify and update application text, maps, and figures and budget, as needed. <br />WSE will electronically deliver completed application to funding agency. <br />Task 3 - Reecer Creek FbD Pre-Applkation (due 1/29/16) <br />WSE will review the project description, details, and budget, along with project background Information <br />(City of Ellensburg Reecer Creek Flood Hazard Reduction and Habitat Restoration Project design, etc.) <br />WSE will also discuss roles and funding with other partner agencies <br />WSE will write application text, develop project budget, and update maps and figures as needed. <br />WSE will electronically deliver completed application to funding agency. <br />Task 4 -Yakima River Phase 2 FbD Pre -Application (due 1/29/16) <br />WSE will review the project description, details, and budget, along with basin background information <br />(recovery plan, corridor plan, etc.) WSE will also discuss roles and funding with partner agencies <br />WSE will modify and update application text, maps, and figures and budget, as needed. <br />Task 5 - YBIP Yakima Corridor Implementation Scope of Work (due TBD) <br />WSE will obtain the new Scope of Work template required by the funder. WSE will revise the draft Scope <br />provided by the County to conform to the funders new Scope format. <br />Task 6- SRFB Ringer Loop Restoration Planning Pre -Application (due 3/2B/16) <br />WSE will meet with the Lead Agency and the Technical Work Group to discuss the proposed Pre - <br />Application. Using feedback from that meeting, WSE will develop Pre -Application for the project that <br />conforms to Lead Entity and RCO Manual 18 guidelines. <br />Schedule <br />WSE will work with County staff to make sure all required Information Is submitted to the funder in -time <br />to meet the due dates noted above. Task Order end date will be May 31, 2016. <br />Agency Project Manager Signature: Date: e/ 20,14 <br />-eref Authorization Date: See ter -Dated: �4zA-,tel /� d •- 7 <br />.-d <br />Consultant Signature: Date: <br />Agency Approving Authorlty: �`� Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.