My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-25-minutes-public-works-study-session
>
Meetings
>
2016
>
10. October
>
2016-10-04 10:00 AM - Commissioners' Agenda
>
2016-01-25-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:31:19 PM
Creation date
5/12/2020 1:30:23 PM
Metadata
Fields
Template:
Meeting
Date
10/4/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
32188
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
US Department of Transportation Federal Lands Access Program <br />Federal Highway Administration Match Agreement <br />Budget: <br />The following documents the expected costs of this project and the Match required: <br />Item Amount <br />Planning <br />Preliminary Engineering <br />$503,835 <br />Construction <br />$1,481,866 <br />Construction Engineering <br />$296,373 <br />Contingency -Contract Mods <br />$150,000 <br />Total Estimated Cost: <br />$2,432,074 <br />Match Rate Required (23 USC 120): 13.50% <br />Value of Match Required*: 5328.330 <br />Western Federal lands Highway Division, FHWA <br />610 E. Fifth Street <br />Vance._.. <br />* Local share calculated per FLAP implementation guidance, <br />http://www.ftiw .dot.gw/map2l/guidance/guideflap.cfm. <br />WA KITTITAS (1) Teanaway Road Hydraulics Improvements Page 2 of 6 <br />doc ver: 05.22.2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.