My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-28-minutes-public-works-study-session
>
Meetings
>
2019
>
05. May
>
2019-05-07 10:00 AM - Commissioners' Agenda
>
2019-01-28-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 12:53:09 PM
Creation date
5/12/2020 12:50:20 PM
Metadata
Fields
Template:
Meeting
Date
5/7/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
53395
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bridge Work <br />€ Master Agreement <br />Agreasaent Number. <br />...,,- <br />Local Agency ad Address <br />Name: Kittitas County Public works <br />Address: 411 N Ruby street; Suite 1 <br />Ellrasbw& WA 91:126 <br />Task Assignment & Estimate <br />This Bridge Work i++taster Agreement (Master Agrent) is made and entered into by <br />and between the Washington State DVatnent of Transportation, hereWdw `VSDOT," <br />rid the above named coumty or city, herchadler "LOCAL AGENCY," collectively <br />referred to as `Pardee" or individually as "Party." <br />WHEREAS, periodically, the LOCAL AGENCY requh= certain work per�ormed on <br />bridges under its jurisdiction end r ibility, but it does not have the necessary <br />expmtw, personnel, equipment; and trace to perform the work, and <br />WEERLU, WSDOT has the nets«ssary else; petwonel, equipment, and, time and <br />agrees to per%rm the LOCAL AGENCY's bridge work, and <br />WH>33REA.. WSDOT and the LOCAL AGENCY desbe to have the periodic mek <br />performed union a Master Agreement, using individual Task Assignments to better <br />identify the work, <br />NOW, THEREFORE, purmwt to RCW 47.28.140, the above recitals that are <br />incorporated herein as if fully set forth below, and in consideration of the terms, <br />madibmi% and provisions contained herein, or Exhibits as attwhed hereto and by this <br />r fixence made a part of this Master Agrameni, <br />IT IS HEREBY AGRM AS FOLLOWS: <br />1. GENERAL AND SCOPE OR WOR <br />1.1 Thin Master Agimment identifies the tam and conditions under which WSDOT <br />shall pm ftnn bridge inspection and maintenance work for the LOCAL AGENCY on <br />bridges awned by or under its ,jurisdiction and responsibility, using esceuted Task <br />Assignmem as the means for detailing the scope of worst and estimated dollar amount <br />for accomplishing the desired work. A sample "Task Assignment and Estimate" form is <br />attached herd as Exhibit A. <br />1.2 WSDOT droll only be responsible for performing the work requested by the <br />LOCAL AGENCY after daternaiining that WSDOT has the nm'=ary labor, equipment, <br />and materials curwntly available to complete the hick within the time frame required by <br />the LOCAL AGENCY and only after both Pares fiWy execute the Task Assignment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.